LG LD40EY5 Service Manual - Page 19

Equipment needed, A-Pulling Vacuum, B-Charging

Page 19 highlights

Equipment needed: Vacuum pump, charging cylinder, manifold gauge, brazing equipment. pinch-off tool capable of making a vapor-proof seal, leak detector, tubing cutter, hand tools to remove components, service valve. EVAPORATOR ASSEMBLY (LOW PRESSURE SIDE) CONDENSER ASSEMBLY (HIGH PRESSURE SIDE) COMPOUND GAUGE MANIFOLD GAUGE A B CAPILLARY TUBE SEE INSETS BELOW COMPRESSOR A B EXTERNAL VACUUM PUMP LOW HI B A CHARGING CYLINDER C Figure 31A-Pulling Vacuum -19- Figure 31B-Charging

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34

—19—
Equipment needed:
Vacuum pump, charging cylinder, manifold gauge, brazing equipment. pinch-off tool capable
of making a vapor-proof seal, leak detector, tubing cutter, hand tools to remove components, service valve.
B
A
COMPRESSOR
COMPOUND GAUGE
MANIFOLD
GAUGE
SEE INSETS
BELOW
EXTERNAL
VACUUM PUMP
CHARGING
CYLINDER
HI
LOW
A
B
A
B
C
CONDENSER ASSEMBLY
(HIGH PRESSURE SIDE)
EVAPORATOR ASSEMBLY
(LOW PRESSURE SIDE)
CAPILLARY
TUBE
Figure 31A-Pulling Vacuum
Figure 31B-Charging