LG LW1804ER Owners Manual - Page 21

Preparation, Of Chassis

Page 21 highlights

WP Series i 2 3 4 5 6 ..... 7 8 9 10 11 12 13 14 15 NAME OF PARTS FRAME CURTAIN suPPoR"rBR.ACK[E S_LL BRACKET LOCK NUT SCREW (TYPF A} SCREW (TYPE B_ _CRE _REW (TYPE D) CARRIAGE BOLT FOAM S"FRiP FOAM SEAL WINDOW LOCKING BRACKET DRNN PiPE FOAM-PE FRAME GUIDE Q'TY 2 2 2 4 14 7 5 2 2 ............1 1 1 1 2 1111¸ I SCREWDRWER(Phiiips and Flatead), RULER, KNIFE,, HAMMER, PENCIL, LEVEL ] PREPARATION OF CHASSIS Remove t}-_ _rews which fasten the cabinet at _th sides ,and at the back.. @ Sliide the unff from the cabinet by gd_ng the ba_ _n ha_le and pulling foeward whiJe bracing the cannel. :_ Cut the window sastl seal to the pro_r length. Peel off the _cNng and at_ch the Foam-Seal @to the u_e_ide of the wi_,ow sash. Remove t_ _c_ from fl_e,top u_er guide Foam-PE @,and _ach it to _e bosom of tile Upper Guide, @ Attac!! the u_r gui@ onto the top, of the _bJi_t with 3 Type A ._rews _]x Inert the Frame Guides @ i_o the bottom of the cabinet, Inert the Frame Cur'_in @ into,the Upper Guide and Frame Guid_ _, Fasten the cut,ins to the unit with 10 Type, A _rews 6_.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27

WP
Series
NAME
OF
PARTS
Q'TY
i
FRAME CURTAIN
2
2
suPPoR"rBR.ACKE
[
2
3
S_LL BRACKET
2
4
LOCK
NUT
4
SCREW
(TYPF
A}
14
SCREW
(TYPE
B_
7
.....
_CRE
5
5
6
7
8
9
10
11
12
13
14
15
_REW
(TYPE
D)
2
CARRIAGE
BOLT
2
FOAM
S"FRiP
.......................................
1
......
FOAM
SEAL
1
WINDOW
LOCKING
BRACKET
1
DRNN
PiPE
..........................
!
......................
FOAM-PE
1
FRAME
GUIDE
2
1111ΒΈ
I
SCREWDRWER(Phiiips
and
Flatead),
RULER,
KNIFE,,
HAMMER,
PENCIL,
LEVEL
]
PREPARATION
OF CHASSIS
Remove t}-_ _rews
which fasten the cabinet at _th
sides ,and at the back..
@
Sliide the unff from the cabinet by gd_ng
the ba_
_n
ha_le
and pulling foeward whiJe bracing the cannel.
:_
Cut the window sastl seal to the pro_r
length.
Peel off the _cNng
and at_ch
the Foam-Seal @to the
u_e_ide
of the wi_,ow
sash.
Remove t_
_c_
from fl_e,top u_er
guide Foam-PE
@,and _ach
it
to _e bosom of tile Upper Guide,
@
Attac!! the u_r
gui@ onto the top, of the _bJi_t
with 3
Type A ._rews
_]x
Inert
the Frame Guides @ i_o the bottom of the
cabinet,
Inert
the
Frame Cur'_in
@ into,the Upper Guide and
Frame Guid_
_,
Fasten the cut,ins
to the unit with 10 Type,
A _rews
6_.