LG LWHD1200HR Owners Manual - Page 12
Preparation - window air conditioner
View all LG LWHD1200HR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 12 highlights
installation NO_ 1 2 3 4 5, 6 7 8, 9 10 11 12 13 NAME OF PARTS FRAME CURTAIN 2 SiLL SUPPORT 2 BOLT 2 NUT 2 SCREW(TYPE A) 16 SCREW_YPE B) 3 SCREW(TYPE C) 5 FOAM-STRIP 1 FOAM-piE 1 DRAIN PiPE 1 FOAM-P'E 1 FRAME GUIDE 2 WIND_J LOCKING 8RiACKF 1 I SCREWORiIVER(+,-)_ RLIL_R_ KN_FE_ HAMMER, PENC|L_ LEVEL ] PREPARATION OF CHASSIS 1, Remove the screws which fasten the cabinet at both sides and at the back, 2. Slide the unit from the cabinet by gripping the base pan handle and pulling forward whiie bracing the _binet. 3. Remove EPS Material,. ,4, Cut the window _sh seal to the proper length, Peel off the _cking and attach the foam-pe ¢9_to i the underside of the window sash, 5 Remove the backing from the top upper guide Foam PE @ ,and at_ch it to the bottom of the upper guide 6 Attach the upper guide onto the top of the _binet with 3,_pe A screws 7_ Inse,_ the frame guides @ into the bottom o# the cabinet, & Insert the Frame Cu_ain/_) _toi the upper guide and frame guides @. 9. Fasten the curtains to the unit with 4 Type A screws_ (Type Upper guide EPS Material 12 Room Air Conditioner (Type A)