Netgear FSM7328PS FSM7328PS Hardware manual - Page 23
Installation, Select a Location.
UPC - 606449051810
View all Netgear FSM7328PS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
Managed Stackable Layer 3 Fast Ethernet Switches Hardware Installation Guide 4. Make sure that all items are present. See "Package Contents" on page 3-1. Note: If any item is found missing or damaged, contact your local NETGEAR reseller for replacement. 5. Inspect the products and accessories for damage. Report any damage immediately. Installation Install the equipment in the sequence presented in this chapter: 1. Select a Location. See "Select a Location" on page 3-4. 2. Install the Switch. See "Install the Switch" on page 3-5. 3. Check the installation. See "Check the Installation" on page 3-6 4. Apply power and check the LEDs. See "Connect to Power and Check the LEDs" on page 3-6. Hardware Installation 3-3 v1.0, May 2007
Managed Stackable Layer 3 Fast Ethernet Switches Hardware Installation Guide
Hardware Installation
3-3
v1.0, May 2007
4.
Make sure that all items are present. See “Package Contents” on page 3-1.
5.
Inspect the products and accessories for damage. Report any damage
immediately.
Installation
Install the equipment in the sequence presented in this chapter:
1.
Select a Location.
See “Select a Location” on page 3-4.
2.
Install the Switch.
See “Install the Switch” on page 3-5.
3.
Check the installation.
See “Check the Installation” on page 3-6
4.
Apply power and check the LEDs.
See “Connect to Power and Check the LEDs” on page 3-6.
Note:
If any item is found missing or damaged, contact your local
NETGEAR reseller for replacement.