Netgear GS716Tv2 GS716Tv2/GS724Tv3 Hardware manual - Page 17
Installation, Step 1: Preparing the Site
View all Netgear GS716Tv2 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 17 highlights
Chapter 4 Installation This chapter describes the installation procedures for your NETGEAR Smart Switch. Switch installation involves the following steps: Step 1: Preparing the Site Step 2: Installing the Switch Step 3: Checking the Installation Step 4: Connecting Devices to the Switch Step 5: Installing an SFP GBIC Module Step 6: Applying AC Power Step 7: Managing the Switch using a Web Browser or the PC Utility Step 1: Preparing the Site Before you installing the switch, ensure the operating environment meets the operating environment requirements in the following table. Table 4-1. Site Requirements Characteristics Requirements Mounting Access • Desktop installations - Provide a flat table or shelf surface. • Rack-mount installations - Use a 17-inch (48.3-centimeter) EIA standard equipment rack that is grounded and physically secure. The rack-mount kit supplied with the switch is also required. Locate the switch in a position that allows access to the front panel RJ-45 ports, view the front panel LEDs, and access power connector. v1.0, June 2009 4-13