Poulan XT1053ES User Manual - Page 6

Install Discharge Chute / Chute Rotater, Head See Fig. 7, Install Auger Control Rod See Figs. 5

Page 6 highlights

ASSEMBLY / PRE-OPERATION INSTALL AUGER CONTROL ROD (See Figs. 5 and 6) The auger control rod has the short loop on the end of the spring as shown. 1. Slide rubber sleeve up rod and hook end of spring into control arm with loop opening up as shown. 2. With top end of rod positioned under right side of control panel, push down on rod and insert end of rod into hole in auger control bracket. Secure with retainer spring. CONTROL ARM AUGER CONTROL ROD RUBBER SLEEVE INSTALL DISCHARGE CHUTE / CHUTE ROTATER HEAD (See Fig. 7) NOTE: The multi-wrench provided in your parts bag may be used to install the chute rotater head. 1. Place discharge chute assembly on top of chute base with discharge opening toward front of snow thrower. 2. Position chute rotater head over chute bracket. If necessary, rotate chute assembly to align square and pin on underside of chute rotater head with holes in chute bracket. 3. With chute rotater head and chute bracket aligned, position chute rotater head on pin and threaded stud of mounting bracket. 4. Install 3/8 washer and locknut on threaded stud and tighten securely. CHUTE ROTATER HEAD 3/8 LOCKNUT 3/8 WASHER LOOP OPENING UP FIG. 5 AUGER CONTROL ROD AUGER CONTROL RETAINER LEVER SPRING CHUTE BRACKET ALIGN BEFORE TIGHTENING LOCKNUT FIG. 7 PIN THREADED STUD ROTATER HEAD MOUNTING BRACKET AUGER CONTROL BRACKET FIG. 6 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40

6
ASSEMBLY / PRE-OPERATION
INSTALL DISCHARGE CHUTE / CHUTE ROTATER
HEAD (See Fig. 7)
NOTE:
The multi-wrench provided in your parts bag may
be used to install the chute rotater head.
1.
Place discharge chute assembly on top of chute base
with discharge opening toward front of snow thrower.
2.
Position chute rotater head over chute bracket.
If neces-
sary, rotate chute assembly to align square and pin on un-
derside of chute rotater head with holes in chute bracket.
3.
With chute rotater head and chute bracket aligned,
position chute rotater head on pin and threaded stud
of mounting bracket.
4.
Install 3/8 washer and locknut on threaded stud and
tighten securely.
AUGER
CONTROL
ROD
CONTROL
ARM
RUBBER
SLEEVE
LOOP
OPENING
UP
FIG. 5
INSTALL AUGER CONTROL ROD (See Figs. 5 and 6)
The auger control rod has the short loop on the end of the
spring as shown.
1.
Slide rubber sleeve up rod and hook end of spring into
control arm with loop opening up as shown.
2. With top end of rod positioned under right side of
control panel, push down on rod and insert end of rod
into hole in auger control bracket.
Secure with retainer
spring.
AUGER
CONTROL
LEVER
AUGER CONTROL ROD
AUGER
CONTROL
BRACKET
RETAINER
SPRING
FIG. 6
CHUTE
ROTATER
HEAD
3/8 WASHER
3/8 LOCKNUT
THREADED
STUD
PIN
ROTATER HEAD
MOUNTING
BRACKET
CHUTE
BRACKET
FIG. 7
ALIGN BEFORE
TIGHTENING LOCKNUT