Samsung DV22N6850HX/A2 User Manual - Page 16

Step 1

Page 16 highlights

Installation Installation Step-by-step installation Make sure you have a qualified technician install the dryer. Step by step installation instructions start below. STEP 1 Connect the electrical wiring First, read through the "Electrical requirements" section, and then follow the instructions on this page or the next page. Instructions for a 3-wire system are on this page. Instructions for a 4-wire system are on the next page. For a 3-wire system 1. Loosen or remove the screws from the center terminal block. 2. Connect the neutral wire (white or A center wire) of the power cable to the center, silver-colored terminal screw of the terminal block. Tighten the B screws. 3. Connect the other wires to outer terminal block screws. Tighten the C screws. 4. Tighten the strain relief screws. D E 5. Insert the terminal block cover into the rear panel of the dryer. Then, secure the cover with a hold-down screw. CAUTION A. Center silver-colored terminal block screw • To convert from the 4-wire system to 3-wire system, connect the ground B. Neutral wire (white or center wire) strap to the terminal block support to C. Neutral grounding wire (white or green/ ground the dryer frame to the neutral yellow) conductor. D. ¾" (1.9 cm) UL-listed strain relief • Ring-type terminals are recommended. E. External ground connector If using strap terminals, make sure they are tightened. 16 English DV6850N_DC68-03650E-05_EN.indd 16 2019/8/7 17:41:33

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132
  • 133
  • 134
  • 135
  • 136
  • 137
  • 138
  • 139
  • 140
  • 141
  • 142
  • 143
  • 144
  • 145
  • 146
  • 147
  • 148
  • 149
  • 150
  • 151
  • 152
  • 153
  • 154
  • 155
  • 156
  • 157
  • 158
  • 159
  • 160
  • 161
  • 162
  • 163
  • 164
  • 165
  • 166
  • 167
  • 168
  • 169
  • 170
  • 171
  • 172
  • 173
  • 174
  • 175
  • 176
  • 177
  • 178
  • 179
  • 180
  • 181
  • 182
  • 183
  • 184
  • 185
  • 186
  • 187
  • 188
  • 189
  • 190
  • 191
  • 192

Installation
Installation
English
16
Step-by-step installation
Make sure you have a qualified technician install the dryer. Step by step installation
instructions start below.
STEP 1
Connect the electrical wiring
First, read through the “
Electrical requirements
” section, and then follow the instructions
on this page or the next page. Instructions for a 3-wire system are on this page.
Instructions for a 4-wire system are on the next page.
For a 3-wire system
A
D
B
C
E
A.
Center silver-colored terminal block
screw
B.
Neutral wire (white or center wire)
C.
Neutral grounding wire (white or green/
yellow)
D.
¾” (1.9 cm) UL-listed strain relief
E.
External ground connector
1.
Loosen or remove the screws from the
center terminal block.
2.
Connect the neutral wire (white or
center wire) of the power cable to the
center, silver-colored terminal screw
of the terminal block. Tighten the
screws.
3.
Connect the other wires to outer
terminal block screws. Tighten the
screws.
4.
Tighten the strain relief screws.
5.
Insert the terminal block cover into the
rear panel of the dryer. Then, secure
the cover with a hold-down screw.
CAUTION
To convert from the 4-wire system
to 3-wire system, connect the ground
strap to the terminal block support to
ground the dryer frame to the neutral
conductor.
Ring-type terminals are recommended.
If using strap terminals, make sure they
are tightened.
DV6850N_DC68-03650E-05_EN.indd
16
2019/8/7
17:41:33