Samsung RF22K9381SR User Manual - Page 48
Provision for Open Access to the Connected Product Requirements
View all Samsung RF22K9381SR manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 48 highlights
Operations Provision for Open Access to the Connected Product Requirements 1. SGIP Open Standards (Smart Energy Profile 2.0 - http://www.csep.org/) - Energy Consumption Reporting - Demand Response 2. Samsung OPEN API - Operational Status, User Settings & Messages - ICE Maker Status: GET /external/icestatus?icegetstatus=opt (relevant to the energy consumption of the product 1) - Door Open Alarm: GET /devices/0/Door?type=opt (relevant to the energy consumption of the product 2) - DR Status: GET /external/drlc?drgetstatus=opt - Delay Defrost Capability - Set Schedule of the Defrost Delay: POST /devices/0/defrost/addSchedule - Get Schedule of the Defrost Delay : GET /devices/0/defrost/getSchedule - Delete Schedule of the Defrost Delay: POST /devices/0/defrost/delSchedule - Defrost Delay On/OFF: PUT /devices/0/defrost/delayevent Operations 48 English Untitled-3 48 2018-07-05 5:55:07