Schwinn A20 Recumbent Bike 2013 Model Assembly and Owner's Manual - Page 10
Install Seat Rail Assembly to Main Assembly, Attach Rear Stabilizer to Seat Rail
View all Schwinn A20 Recumbent Bike 2013 Model manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 10 highlights
5. Install Seat Rail Assembly to Main Assembly NOTICE: C onnect Heart Rate (HR) cables from Seat Rail and Main Unit. Do not crimp cables. 6. Attach Rear Stabilizer to Seat Rail NOTICE: C onnect Heart Rate (HR) cables from Seat Rail and Handlebar. Do not crimp cables. X4 3 6mm E D 10
10
5. Install Seat Rail Assembly to Main Assembly
NOTICE:
Connect Heart Rate (HR) cables from Seat Rail and Main Unit. Do not crimp cables.
6. Attach Rear Stabilizer to Seat Rail
NOTICE:
Connect Heart Rate (HR) cables from Seat Rail and Handlebar. Do not crimp cables.
X4
E
D
6mm
3