Seiko 7L22 Manual - Page 12

Ex. 1

Page 12 highlights

English To measure the hourly rate of operation 1 Use the stopwatch to measure the time required to complete 1 job. 2 Tachymeter scale indicated by STOPWATCH second hand gives the average number of jobs accomplished per hour. 80 75 90 7 Ex. 1 65 0 60 TACHYMETER 500 300 250 400 STOPWATCH second hand: 20 seconds 200 180 16 0 140 100 120 Tachymeter scale: "180" "180" (tachymeter scale figure) x 1 job = 180 jobs/hour Ex. 2: If 15 jobs are completed in 20 seconds: "180" (tachymeter scale figure) x 15 jobs = 2700 jobs/hour 12

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15

English
12
6
0
T
A
C
H
Y
M
E
T
E
R
5
0
0
4
0
0
3
0
0
2
5
0
2
0
0
1
8
0
1
6
0
1
4
0
1
2
0
1
0
0
9
0
8
0
7
5
7
0
6
5
To measure the hourly rate of operation
Use the stopwatch to
measure the time required to
complete 1 job.
Tachymeter scale indicated
by STOPWATCH second
hand gives the average
number of jobs accomplished
per hour.
STOPWATCH
second hand:
20 seconds
Tachymeter scale: “180”
“180” (tachymeter scale figure) x 1 job
= 180 jobs/hour
Ex. 1
1
2
Ex. 2: If 15 jobs are completed in 20 seconds:
“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour