Seiko 7T62 Manual - Page 16
To measure the hourly rate of operation
View all Seiko 7T62 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 16 highlights
English To measure the hourly rate of operation 1 Use the stopwatch to measure the time required to complete 1 job. 2 Tachymeter scale indicated by STOPWATCH second hand gives the average number of jobs accomplished per hour. Ex. 1 STOPWATCH second hand: 20 seconds Tachymeter scale: "180" "180" (tachymeter scale figure) x 1 job = 180 jobs/hour Ex. 2: If 15 jobs are completed in 20 seconds: "180" (tachymeter scale figure) x 15 jobs = 2700 jobs/hour 16
16
English
To measure the hourly rate of operation
Use the stopwatch to measure
the time required to complete 1
job.
1
Tachymeter scale indicated by
STOPWATCH second hand gives
the average number of jobs ac-
complished per hour.
2
Ex. 1
STOPWATCH
second hand:
20 seconds
Tachymeter scale: “180”
“180” (tachymeter scale figure) x 1 job
= 180 jobs/hour
Ex. 2:
If 15 jobs are completed in 20 seconds:
“180” (tachymeter scale figure) x 15 jobs = 2700 jobs/hour