Sharp EL738C EL-738 Operation Manual - Page 54

Calculating number of days, Finding a date

Page 54 highlights

1 Calculating number of days Calculate the number of days between December 25, 2008 and August 10, 2009 (using US date format and the actual calendar). Procedure Key operation Bring up the initial dis- s play in NORMAL mode. Display 000 Select day and date calculations, and set all the variables to default values. K . b M-D-Y 1=[MO] 1- 1-2001 Make sure the actual calendar is set (360 is not displayed). Enter the first date. 12252008 Q M-D-Y 1=[TH] 12-25-2008 Enter the last date. i 8102009 Q M-D-Y 2=[MO] 8-10-2009 Move to DAYS and calculate. i @ DAYS= 22800 Answer: 228 days • If the 360-day calendar is selected, the answer will be 225 days. 2 Finding a date Find the date 100 days after November 13, 2010 (using US date format and the actual calendar). Procedure Key operation Bring up the initial dis- s play in NORMAL mode. Select day and date calculations, and set all the variables to default values. K . b Display 000 M-D-Y 1=[MO] 1- 1-2001 Make sure the actual calendar is set (360 is not displayed). Enter the first date. 1113210 Q M-D-Y 1=[SA] 11-13-2010 Move to DAYS and en- i i 100 Q ter the number of days. DAYS= 10000 53

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88

53
Calculating number of days
Calculate the number of days between December 25, 2008 and
August 10, 2009 (using US date format and the actual calen-
dar).
Procedure
Key operation
Display
Bring up the initial dis-
play in NORMAL mode.
s
000
Select day and date
calculations, and set all
the variables to default
values.
K
.
b
M-D-Y
1=[MO]
1-
1-2001
Make sure the actual calendar is set (
360
is not displayed).
Enter the first date.
12252008
Q
M-D-Y
1=[TH]
12-25-2008
Enter the last date.
i
8102009
Q
M-D-Y
2=[MO]
8-10-2009
Move to DAYS and
calculate.
i
@
DAYS=
22800
Answer:
228 days
• If the 360-day calendar is selected, the answer will be 225 days.
Finding a date
Find the date 100 days after November 13, 2010 (using US date
format and the actual calendar).
Procedure
Key operation
Display
Bring up the initial dis-
play in NORMAL mode.
s
000
Select day and date
calculations, and set all
the variables to default
values.
K
.
b
M-D-Y
1=[MO]
1-
1-2001
Make sure the actual calendar is set (
360
is not displayed).
Enter the first date.
1113210
Q
M-D-Y
1=[SA]
11-13-2010
Move to DAYS and en-
ter the number of days.
i
i
100
Q
DAYS=
10000
1
2