Thermador VCI248DS Installation Instructions - Page 7

Step 1: PREPARING THE CUTOUT, Preparing the wooden framework, Step 2: PREPARING THE INSTALLATION, - weight

Page 7 highlights

BEFORE INSTALLATION Step 1: PREPARING THE CUTOUT ❑ The wall must be flat and vertical. ❑ Make sure that the wall is capable of providing a firm hold for mounting screws and plugs. Weight in kg: 24,5. Preparing the wooden framework Step 2: PREPARING THE INSTALLATION There are two mounting methods: Installation in wooden framework or Installation with the mounting brackets provided. - Remove mounting brackets by removing screws Preparing the installation with mounting brackets 4 x 1/4" holes - After removing the mounting brackets, the screws must be inserted again. PAGE 5

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28

PAGE 5
BEFORE INSTALLATION
Step 1: PREPARING THE CUTOUT
The wall must be flat and vertical.
Make sure that the wall is capable of providing a firm
hold for mounting screws and plugs.
Weight in kg: 24,5.
Preparing the wooden framework
Step 2: PREPARING THE INSTALLATION
There are two mounting methods:
Installation in wooden framework
or
Installation with the mounting brackets provided.
Remove mounting brackets by removing screws
After removing the mounting brackets, the screws must
be inserted again.
Preparing the installation with mounting
brackets
4 x 1/4" holes