ViewSonic PM-FCP Instruction Manual - Page 9
Installation Instructions,
View all ViewSonic PM-FCP manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
PM-FCP Braided Cable Cable Lock EMT Conduit Ceiling Tile T-Bar Frame Step 1. Once the braided cables have been attached to the upper mounting structure (wood joist, concrete or ceiling truss), it is now time to attach the braided cable to the PM-FCP. Step 2. Thread each braided cable through the Quick Lock (see previous page). Step 3. Loop the braided cables through the space between the EMT conduit pipe and the top of the pipe clamp (see previous page). Step 4. When adjusting the tension of the weight-bearing side of the Quick Lock, the cable must be pulled through the Quick Lock until the desired tension is attained. Once attained, pull the braided cable through the other side of the Quick Lock (see previous page). Step 5. Once the tension has been adjusted, be sure that there is at least 6" of excess braided cable on the non-weight bearing side of the Quick Lock. Step 6. Use cable cutters to remove any remaining braided cable (optional). Ceiling Tile If you chose to use the optional EMT conduit pipe, the ceiling tiles where the EMT conduit pipe crosses over must be installed prior to installing the EMT conduit pipe. Step 7. Reinstall the ceiling tile. Installation Instructions Page 9