Vizio S4221w-C4 Quickstart Guide - Page 22

Installing The Cable Management Tie

Page 22 highlights

INSTALLING THE CABLE MANAGEMENT TIE The Cable Management Tie can be used to organize the input and power cables behind the sound bar. 1. Place the Sound Bar face down on a non-marring or soft flat level surface. 2. Insert the Tie into the hole on the center of the Sound Bar. 3. Insert the Pin into the Tie to secure the Cable Management Tie. 4. To remove the Cable Management Tie, remove the Pin and gently pull the Tie. Pin Tie 22

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32

22
INSTALLING THE CABLE MANAGEMENT TIE
The Cable Management Tie can be used to organize the input and power
cables behind the sound bar.
1.
Place the Sound Bar face down on a non-marring or soft flat level surface.
2.
Insert the
Tie
into the hole on the center of the Sound Bar.
3.
Insert the
Pin
into the
Tie
to secure the Cable Management Tie.
4.
To remove the Cable Management Tie, remove the
Pin
and gently pull the
Tie
.
Pin
Tie