Weider Club C4800 English Manual - Page 20
Route the Ab Cable 66 through the Butterfly
View all Weider Club C4800 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
49. Route the Ab Cable (66) through the Butterfly Upright (2). Attach a 100mm Pulley (38) inside the Leg Lever Base (5) with an M10 x 65mm Bolt (80), two M10 Washers (99), two 12.5mm Spacers (69), and an M10 Nylon Locknut (101). 49 66 2 5 38 101 99 69 69 99 80 50. Note: This step is shown from the back of the weight system. Lay the Ab Cable (66) in the indicated brackets. Attach a 100mm Pulley (38) inside the bracket on the Base (1) with an M10 x 45mm Bolt (51) and an M10 Nylon Locknut (101). 50 Brackets 51 38 1 101 66 51. Wrap the Ab Cable (66) over a 100mm Pulley 51 (38). Attach the Pulley and a Long Cable Trap (68) to the second set of holes from the bottom of the two Pulley Plates (41) with an M10 x 50mm Bolt (81) and an M10 Nylon Locknut (101). Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley. Make sure the Cable is routed over the Pulley toward the front of the Butterfly Upright (2). 52. Note: The following steps are shown from the 52 back of the weight system. Wrap the Ab Cable (66) under a 100mm Pulley (38). Attach the Pulley and a Long Cable Trap (68) to the Butterfly Upright (2) with an M10 x 50mm Bolt (81) and an M10 Nylon Locknut (101). Make sure the Cable Trap is oriented to hold the Cable in the groove of the Pulley. 41 2 101 68 81 38 66 81 66 38 68 2 101 20