Weider Pro 355 English Manual - Page 6

Assembly

Page 6 highlights

ASSEMBLY Before beginning assembly, carefully read the following information and instructions:_ _ • Place all parts of the WEIDER® PRO 355 in a cleared area and remove the packing materials; do not dispose of the packing materials until assembly is completed. • Read each assembly step before you begin. • For help identifying the small parts used in assembly, use the PART IDENTIFICATION CHART on the previous page. Note: Some small parts may have been pre-attached for shipping purposes. If a part is not in the parts bag, check to see if it has been pre-attached. • Tighten all parts as you assemble them, unless instructed to do otherwise. • As you assemble the WEIDER® PRO 355, make sure that all parts are oriented as shown in the drawings. THE FOLLOWING TOOLS (NOT INCLUDED) ARE REQUIRED FOR ASSEMBLY: • Two (2) adjustable wrenches F-)-- • One (1) standard screwdriver =-----E=c) • One (1) rubber mallet • Lubricant, such as grease or petroleum jelly, and soapy water will also be needed. Assembly will be more convenient if you have the following tools: A socket set, a set of open-end or closed-end wrenches, or a set of ratchet wrenches. 1. Before beginning assembly, be sure that you have read and understand the information in the box above. Set the Left Base (20) and the Right Base (56) on the floor. Be sure that the indented holes in the Left Base and the Right Base are facing the floor. Attach the Left Base (20) and the Right Base (56) with the "U" Bracket (30), two M8 x 68mm Bolts (8), and two M8 Nylon Locknuts (4). Do not tighten the Nylon Locknuts yet. Press a 2" Square Inner Cap (46) into each section of the Base. Insert two M8 x 60mm Carriage Bolts (3) up through the Left Base (20) and the Right Base (56), and "U" Bracket (30). Slide the Main Upright (42) onto the Carriage Bolts. The welded post on the Main Upright must be on the side shown. Hand-tighten an M8 Nylon Locknut (4) onto each Carriage Bolt. Press a 2 1/2" Square Bushing (53) into the Carriage Stop (54). The drilled hole in the Square Bushing must be aligned with the hole in the Carriage Stop. Slide the Carriage Stop onto the Main Upright (42). Align the holes in the Carriage Stop with the Indicated holes h the Main Upright. Insert an M8 x 68mm Bolt (8) through the Carriage Stop and Main Upright. Tighten an M8 Nylon Locknut (4) onto the Bolt. Insert two M8 x 60mm Carriage Bolts (3) into the Left Base (20) and into the Right Base (56). 1 53 Drilled Hole 4 42 4 30 20 3 8 54 Align these Holes Welded Post must be on this side 56 8 3 46 46 The Indented Holes must face the floor

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

ASSEMBLY
Before
beginning
assembly,
carefully
read
the
following
information
and
instructions:_
_
Place
all
parts
of
the
WEIDER®
PRO
355
in
a
cleared
area
and
remove
the
packing
materials;
do
not
dispose
of
the
packing
materials
until
assembly
is
completed.
Read
each
assembly
step
before
you
begin.
For
help
identifying
the
small
parts
used
in
assembly,
use
the
PART
IDENTIFICATION
CHART
on
the
previous
page.
Note:
Some
small
parts
may
have
been
pre
-attached
for
ship-
ping
purposes.
If
a
part
is
not
in
the
parts
bag,
check
to
see
if
it
has
been
pre
-attached.
Tighten
all
parts
as
you
assemble
them,
unless
instructed
to
do
otherwise.
As
you
assemble
the
WEIDER®
PRO
355,
make
sure
that
all
parts
are
oriented
as
shown
in
the
drawings.
THE
FOLLOWING
TOOLS
(NOT
INCLUDED)
ARE
REQUIRED
FOR
ASSEMBLY:
Two
(2)
adjustable
wrenches
One
(1)
standard
screwdriver
=-----E=c)
One
(1)
rubber
mallet
F
---
)
Lubricant,
such
as
grease
or
petroleum
jelly,
and
soapy
water
will
also
be
needed.
Assembly
will
be
more
convenient
if
you
have
the
following
tools:
A
socket
set,
a
set
of
open-end
or
closed
-end
wrenches,
or
a
set
of
ratchet
wrenches.
1.
Before
beginning
assembly,
be
sure
that
you
have
read
and
understand
the
information
in
the
box
above.
Set
the
Left
Base
(20)
and
the
Right
Base
(56)
on
the
floor.
Be
sure
that
the
indented
holes
in
the
Left
Base
and
the
Right
Base
are
facing
the
floor.
Attach
the
Left
Base
(20)
and
the
Right
Base
(56)
with
the
"U"
Bracket
(30),
two
M8
x
68mm
Bolts
(8),
and
two
M8
Nylon
Locknuts
(4).
Do
not
tight-
en
the
Nylon
Locknuts
yet.
Press
a
2"
Square
Inner
Cap
(46)
into
each
section
of
the
Base.
Insert
two
M8
x
60mm
Carriage
Bolts
(3)
up
through
the
Left
Base
(20)
and
the
Right
Base
(56),
and
"U"
Bracket
(30).
Slide
the
Main
Upright
(42)
onto
the
Carriage
Bolts.
The
welded
post
on
the
Main
Upright
must
be
on
the
side
shown.
Hand
-tighten
an
M8
Nylon
Locknut
(4)
onto
each
Carriage
Bolt.
Press
a
2
1/2"
Square
Bushing
(53)
into
the
Carriage
Stop
(54).
The
drilled
hole
in
the
Square
Bushing
must
be
aligned
with
the
hole
in
the
Carriage
Stop.
Slide
the
Carriage
Stop
onto
the
Main
Upright
(42).
Align
the
holes
in
the
Carriage
Stop
with
the
Indicated
holes
h
the
Main
Upright.
Insert
an
M8
x
68mm
Bolt
(8)
through
the
Carriage
Stop
and
Main
Upright.
Tighten
an
M8
Nylon
Locknut
(4)
onto
the
Bolt.
Insert
two
M8
x
60mm
Carriage
Bolts
(3)
into
the
Left
Base
(20)
and
into
the
Right
Base
(56).
1
Drilled
Hole
4
20
53
4
42
30
8
54
8
3
46
Align
these
Holes
Welded
Post
must
be
on
this
side
56
46
The
Indented
Holes
must
3
face
the
floor