ZyXEL NAS540 User Guide - Page 299
Table 101, Label, Description
View all ZyXEL NAS540 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 299 highlights
Chapter 19 Maintenance Screens Table 101 Maintenance > Power (continued) LABEL DESCRIPTION Always Power Off Select this option to keep the NAS from automatically restarting when the power is restored after a power failure. This is a computer's "traditional" behavior. Select this if you have other servers such as a domain controller or DNS server that you want to start or check after a power failure before the NAS turns on. Power On/Off Schedule Enable Power Select this option to have the NAS turn itself off and on or reboot according to the Control Schedule schedules you configured. Click Edit to go to the screen where you can configure the power control schedules. Refer to Section 19.3.1 on page 300 for this screen. Enable Wake On LAN Note: Enable Wake On LAN to be able to turn on the NAS through its wired Ethernet connection. You must have a computer or router on your LAN that supports sending Wake On LAN "magic packets" to turn on the NAS. To use Wake On LAN from a computer on your LAN, install a program such as Wake On LAN EX or another Wake On LAN program that supports sending magic packets. You can use Wake On LAN from a remote location if the router in front of the NAS supports sending magic packets. Apply Reset Use the NAS's power button or the Web Configurator's Maintenance > Shutdown menu to turn off the NAS. Click this to save your changes. Click this to restore previously saved settings. NAS540 User's Guide 299