3Com 3CB9E7 Getting Started Guide - Page 56

Where to Go from Here, Management Engine User Guide

Page 56 highlights

56 CHAPTER 5: START THE SWITCH If you power on a power supply and it is not operating, the Character Display displays the following: PWR x. Where x is the number of the power supply that is not operating. The installed switch fabric module Status LED flashes green. When the power-on phase has completed successfully, normal operation begins and switch fabric module Status LEDs stop flashing and remain a steady green. If one of the power-on diagnostic tests fails, then the switch fabric module Status LED turns a steady yellow. The Switch displays the following message when the management module is installed properly and the RS-232 connection is made: CoreBuilder 9000 Enterprise Management Engine (vx.xx) Copyright (c) 1999 3Com Corporation. Login: To continue operating and configuring your Switch, see the CoreBuilder 9000 Enterprise Management Engine User Guide. Where to Go from Here To verify that the CoreBuilder 9000 chassis and all modules have been installed correctly, examine the LED status on each module. To obtain information about a module's LEDs and status indicators, see the User Guide, Getting Started Guide, or Quick Start Guide for that module. Table 9 indicates what to do after you power on the Switch. For detailed information about the tasks that are listed in Table 9, see the Enterprise Management Engine Quick Start Guide for the CoreBuilder 9000 Enterprise Switch or the CoreBuilder 9000 Enterprise Management Engine User Guide.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94
  • 95
  • 96
  • 97
  • 98
  • 99
  • 100
  • 101
  • 102
  • 103
  • 104
  • 105
  • 106
  • 107
  • 108
  • 109
  • 110
  • 111
  • 112
  • 113
  • 114
  • 115
  • 116
  • 117
  • 118
  • 119
  • 120
  • 121
  • 122
  • 123
  • 124
  • 125
  • 126
  • 127
  • 128
  • 129
  • 130
  • 131
  • 132

56
C
HAPTER
5: S
TART
THE
S
WITCH
If you power on a power supply and it is not
operating, the Character Display displays the
following:
PWR x
.
Where
x
is the number of the power supply that is not
operating.
The installed switch fabric module Status LED flashes
green.
When the power-on phase has completed
successfully, normal operation begins and switch
fabric module Status LEDs stop flashing and remain a
steady green.
If one of the power-on diagnostic tests fails, then the
switch fabric module Status LED turns a steady
yellow.
The Switch displays the following message when the
management module is installed properly and the
RS-232 connection is made:
CoreBuilder 9000 Enterprise Management Engine
(vx.xx)
Copyright (c) 1999 3Com Corporation.
Login:
To continue operating and configuring your Switch,
see the
CoreBuilder 9000 Enterprise Management
Engine User Guide
.
Where to Go from Here
To verify that the CoreBuilder 9000 chassis and all
modules have been installed correctly, examine the
LED status on each module. To obtain information
about a module’s LEDs and status indicators, see the
User Guide
,
Getting Started Guide
,
or
Quick Start
Guide
for that module.
Table 9 indicates what to do after you power on the
Switch.
For detailed information about the tasks that are
listed in Table 9, see the
Enterprise Management
Engine Quick Start Guide
for the CoreBuilder 9000
Enterprise Switch
or the
CoreBuilder 9000 Enterprise
Management Engine User Guide
.