Acer Aspire 7750Z Acer Aspire 7750, 7750G, 7750Z Notebook Service Guide - Page 89
Base Door Removal, Base Door Installation, Prerequisite
View all Acer Aspire 7750Z manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 89 highlights
Base Door Removal 0 Prerequisite: Battery Pack removal 1. Loosen three (3) captive screws (C). 2. Using tab (B), remove door (A) from lower cover. B C C C A D Figure 3-5. Removing the Base Door Base Door Installation 0 1. Insert door flanges into slots (D) on lower cover (Figure 3-5). 2. Install and secure door to lower cover with three (3) captive screws. 3. Install battery pack. Machine Maintenance Procedures 3-11
We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.
We apologize for any inconveniece.