Acer TravelMate 250 TravelMate 240/250 Service Guide - Page 86

Installing the Touchpad Cable, See Installing the CPU Heatsink Plate

Page 86 highlights

3. See "Installing the PCMCIA Slot" on page 86. 4. See "Installing the Main Board" on page 86. 5. See "Installing the HDD Bracket" on page 87. 6. See "Installing the CPU Heatsink Plate" on page 88. 7. Put the FDD module to the main board. Secure the FDD module with two screws. 8. Connect the FDD cable to the main board. Installing the Touchpad Cable 1. Attach the touchpad cable to the upper case, and then pull out the cable. 2. Place the touchpad scroll key to the upper case. Installing the Touchpad Board 1. See "Installing the Touchpad Cable" on page89. 2. Put the touchpad board and the touchpad button pad to the upper case. Then attach the touchpad cover to the upper case as the picture shows. 77 TravelMate 240/ 250

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

We apologize for any inconveniece.