Acer X223 X223W LCD Service Guide - Page 13

Assembly and Disassembly Procedures - lcd

Page 13 highlights

12 ACER X223W Go to cover page 4. Assembly and Disassembly Procedures 4.1 Assembly procedures: Connect the cable between power board(P802) S1 and interface board (P301) Connect the function key cable into interface board(P306) Connect the FFC cable into interface board Take the key function cable out from the hole S5 shown as photo Fix the function key cable with a PVC tape P802 P301 FFC P306 Take a bracket chassis base on a protective S2 cushion and stick an insulator on the specific position, take a power board and turn it over. Then, put it on the specific positions of bracket chassis base. Turn the monitor faced down and put it on the S6 Bracket Chassis module till both parts firmly Take lamp cables out from the holes shown as the photo. Use a Phillips-head screwdriver screwed the S3 No.1~4 screws till that power board and bracket chassis base firmly attached.(No1 screw size=M4x8; No2~4 screw size=M3x6; Torque=9~10KGFxCM). 3 2 4 1 S4 Use a Phillips-head screwdriver screwed the No.1~4 screws till that interface board and bracket chassis base firmly attached. 3 2 Connect the FFC cable to the connector of the LCD S7 panel. 4 1

We apologize, but we cannot currently deliver this PDF manual by request of the manufacturer.

You can visit the Acer X223 on the Acer site to download this or other manuals by visiting this link.

We apologize for any inconveniece.