Amana NGD4600YQ Installation Instruction - Page 4
Installation Requirements - parts
![]() |
View all Amana NGD4600YQ manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
INSTALLATION REQUIREMENTS Tools and Parts Gather the required tools and parts before starting installation. Tools needed for all installations: Adjustable wrench that opens to 1" (25 mm) or hex-head socket wrench Caulking gun and compound (for installing new exhaust vent) Flat-blade screwdriver #2 Phillips screwdriver 1/4" nut driver or socket wrench (recommended) Tin snips (new vent installations) Utility knife Putty knife Tools needed for gas installations: Tape measure Vent clamps 8" or 10" pipe wrench 8" or 10" adjustable wrench (for gas connections) Level 4 Pliers Pipe-joint compound resistant to LP gas
![](/manual_guide/products/amana-ngd4700yq-installation-instruction-f9fa23e/4.png)
4
Tools and Parts
Gather the required tools and parts before starting installation.
Tools needed for all installations:
Level
Tape measure
Pliers
Flat-blade screwdriver
#2 Phillips screwdriver
Adjustable wrench that
opens to 1" (25 mm)
or
hex-head socket wrench
Tin snips (new vent
installations)
Caulking gun and compound
(for installing new exhaust vent)
Vent clamps
1/4" nut driver or socket
wrench (recommended)
Tools needed for gas installations:
8" or 10" pipe wrench
8" or 10" adjustable wrench
(for gas connections)
Pipe-joint compound
resistant to LP gas
Utility knife
INSTALLATION REQUIREMENTS
Putty knife