Asko TDC User manual 8089884 Asko Professional TDC111V EN - Page 26
Coin operation
![]() |
View all Asko TDC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 26 highlights
Installation instructions 4 7 8 6 5. Remove ground wire (green with yellow stripes) from external ground connector screw and remove from center terminal block. 6. Connect ground (green) wire of cord to external ground conductor screw. 7. Connect neutral (white) wire of cord under center screw of terminal block. 8. Connect the other wires to outer screws. 9. Tighten the strain relief screws. 10. Replace terminal box cover on back of dryer. 11. Plug dryer into wall receptacle. 12. Turn power on at breaker/fuse box. Coin operation The machine is prepared for coin operation. Such installation must be carried out by a qualified professional. The installation requires a connection cable to power the coin meter. This connection cable can be ordered using spare part number 92 090 95. The coin meter shall be able to short circuit two signal lines for periods of up to 10 minutes. This is to give the user time to load the machine, choose a program, and start the program after putting the coins in. "Insert coin" appears on the display when the machine is started with the main power switch. 26 Customer Care Center 1-800-898-1879 www.askousa.com
![](/manual_guide/products/asko-tdc-user-manual-8089884-asko-professional-tdc111v-en-6e57d10/26.png)