Biostar M7TDE M7TDE compatibility test report - Page 62

O.C.P test

Page 62 highlights

M/B VID Setting Electronic Loading VCORE OCP & OVP TEST-Ver1.0 Test Environment TDE/1.0 Power Supply 1.75V PWM Chroma 63030 Engineer Signature ST-300BLV HIP6302 Yi-Hung O.C.P test 43.5A Pass/Fail Pass O.V.P test 2.02 Pass/Fail Pass Comments: M/B VID Setting Electronic Loading O.C.P test 50A Comments: VCORE OCP & OVP TEST-Ver1.1 Test Environment TDE/1.1 Power Supply Enlight HPC-250 1.75V PWM HIP6302 Chroma 63030 Engineer Signature Panda Pass/Fail Pass O.V.P test 2.17 Pass/Fail Pass M/B VID Setting Electronic Loading O.C.P test 50A Comments: VCORE OCP & OVP TEST-Ver1.2 Test Environment TDE/1.2 Power Supply Enlight HPC-250 1.75V PWM HIP6302 Chroma 63030 Engineer Signature Panda Pass/Fail Pass O.V.P test 2.17 Pass/Fail Pass 62

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62

62
V
CORE
OCP & OVP TEST-Ver1.0
Test
Environment
M/B
TDE/1.0
Power Supply
ST-300BLV
VID Setting
1.75V
PWM
HIP6302
Electronic
Loading
Chroma
63030
Engineer Signature
Yi-Hung
O.C.P test
43.5A
Pass/Fail
Pass
O.V.P test
2.02
Pass/Fail
Pass
Comments:
V
CORE
OCP & OVP TEST-Ver1.1
Test
Environment
M/B
TDE/1.1
Power Supply
Enlight HPC-250
VID Setting
1.75V
PWM
HIP6302
Electronic
Loading
Chroma
63030
Engineer Signature
Panda
O.C.P test
50A
Pass/Fail
Pass
O.V.P test
2.17
Pass/Fail
Pass
Comments:
V
CORE
OCP & OVP TEST-Ver1.2
Test
Environment
M/B
TDE/1.2
Power Supply
Enlight HPC-250
VID Setting
1.75V
PWM
HIP6302
Electronic
Loading
Chroma
63030
Engineer Signature
Panda
O.C.P test
50A
Pass/Fail
Pass
O.V.P test
2.17
Pass/Fail
Pass
Comments: