Brother International BAS-612 Instruction Manual - English - Page 16

Brother International BAS-612 Manual

Page 16 highlights

CORRECT OPERATION [3] [To remove the bobbin cases] O 1. Open slide plates R 0 and L 0 2. Hold the corners of bobbin cases 0 and remove them. [To thread a bobbin case] BAS-610 and BAS-611 50mm (e< 1. Insert a bobbin into the bobbin case. 2. Thread the thread through notch 0 and then under tension spring 0 . 3. Pull approximately 50 mm of thread through the hole at the end of tension spring 4. Insert the bobbin case into the rotary hook. .0 . 0 . 9 BAS-612 B 0 50mm e 1. Insert bobbin 0 into bobbin case 0 . 4 2. Thread the thread through notch A and then under tension spring . 3. Thread the thread through notches B and C and then hang it on bobbin-thread sag prevention spring 4. Pull approximately 50 mm of thread through hole -12-

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58

CORRECT
OPERATION
[3]
<Threading
the
bobbin
thread
>
[To
remove
the
bobbin
cases]
O
1.
Open
slide
plates
R
0
and
L
0
2.
Hold
the
corners
of
bobbin
cases
0
and
remove
them.
[To
thread
a
bobbin
case]
BAS
-610
and
BAS
-611
50mm
BAS
-612
B
0
(e
<
e
50mm
4
1.
Insert
a
bobbin
into
the
bobbin
case.
2.
Thread
the
thread
through
notch
0
and
then
under
tension
spring
0
.
3.
Pull
approximately
50
mm
of
thread
through
the
hole
at
the
end
of
tension
spring
4.
Insert
the
bobbin
case
into
the
rotary
hook.
1.
Insert
bobbin
0
into
bobbin
case
0
.
2.
Thread
the
thread
through
notch
A
and
then
under
tension
spring
.
3.
Thread
the
thread
through
notches
B
and
C
and
then
hang
it
on
bobbin
-thread
sag
prevention
spring
4.
Pull
approximately
50
mm
of
thread
through
hole
—12—