Brother International BES-1241BC Instruction Manual - English - Page 23
Installation, DANGER
View all Brother International BES-1241BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 23 highlights
3. Installation Chapter 1 Preparation of Embroidery Machine DANGER Embroidery machines should be installed only by trained engineers. Electric wiring should be laid by your distributor or electric experts. A machine weighs more than 600 kg. Installation should be carried out by 4 or more workers. Do not connect the power source until installation is completed. Doing so may start the machine unintentionally through an accidental activation of the START switch, resulting in bodily injuries. Install a machine in a place away from a highfrequency welding machine or other machines that may generate a strong electric noise. Failure to do so may cause the embroidery machine to malfunction. Be sure to connect the ground. If the ground connection is not secure, you run a high risk of receiving a serious electric shock, and problems with correct operation may also occur. Secure the machine with the casters when installing it so that it will not move by placing the leveling seat on the sound floor. * After installation is completed, get the power supply from a dedicated outlet. * When connecting multiple machines, exercise care not to exceed the capacity of the outlet. 3-1 Transportation of Machine When relocating the machine, push the steel frame. Note) Never push the cover or carriage. When using a fork lift Center pillar The central seal Lift forks a a Open the forks of the lift to both sides evenly from the central seal positioned at the center (viewed from the rear of the machine), and pass them under the legs to lift the machine. BES-941BC • BES-1241BC 21