Brother International BES-961BC Maintenance Schedule - English - Page 9
Heads continued
View all Brother International BES-961BC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 9 highlights
BES-940,941,1240,1241 960,961,962,963,1260,1261,1262,1263 For Technical Assistance Please Call Toll Fre e 1-877-4BROTHER Email: [email protected] Website: http://www.brother-usa.com/industembroidery/tech_down.aspx 6 Month Maintenance Greasing Heads continued 5. Remove the power switch cover by removing the 3 top 7. On 4 head models. Remove the color change screws and loosening the 2 lower ones. Cover can be rod cover by removing the 2 screws. layed down on machine or by disconnecting the 3 connectors removed completely. 6. Remove the color change assembly cover by removing the two top screws and loosening the 2 bottom screws. 8. Manually color change the machine in between needles 4 and 5 on 9 needle machines or between 6 and 7 on 12 needle machines by rotating the knob underneath the color change box. 5/24/05 9