CyberPower PDU20M2F8R User Manual - Page 7

Vertical Installation with Keyhole Mounts 0U Models

Page 7 highlights

Vertical Installation with Keyhole Mounts (0U Models) Step 1 - Keyhole Mount installation Attach the Keyhole Mounting Pegs to the PDU with the 2 supplied Bracket Mounting Screws (M4 X 6). Step 2 - PDU Mounting Align the the Keyhole Mounts to the Keyhole Slots on the rack. Insert and slide down to lock firmly into place. Cord Retention Tray installation (Optional for both horizontal and vertical installations) Adjust the length of the Cord Retention Tray till the screw hole on the Tray and PDU are aligned. Attach the Cord Retention Tray to the PDU with the 4 supplied Cord Retention Tray Mounting Screws (M3 X 6). Tighten the Cord Retention Tray with the screw on it. Use the Cable Ties provided to fasten each power cord to the Cord Retention Tray. Meter Configuration ! Depending on installation method (vertical or horizontal), the LED Meter may need to be rotated, before installation, Note for proper orientation. Use a screwdriver to gently remove the LED Meter. Rotate the LED Meter 90 degrees, and insert back into the PDU. 5 For information on Cyberpower products, visit www.cyberpower.com

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16

Vertical Installation with Keyhole Mounts (0U Models)
Align the the Keyhole Mounts to the Keyhole Slots on the rack.
Insert and slide down to lock firmly into place.
Step 2 – PDU Mounting
Step 1 – Keyhole Mount installation
Attach the Keyhole Mounting Pegs to the PDU with the 2 supplied
Bracket Mounting Screws (M4 X 6).
For information on Cyberpower products, visit www.cyberpower.com
5
Cord Retention Tray installation
(Optional for both horizontal and vertical installations)
Attach the Cord Retention Tray to the PDU with the 4 supplied Cord
Retention Tray Mounting Screws (M3 X 6). Tighten the Cord Retention Tray
with the screw on it.
Use the Cable Ties provided to fasten each power cord to the Cord Retention
Tray.
Meter Configuration
Use a screwdriver to gently remove the LED Meter.
Rotate the LED Meter
90 degrees, and insert back into the PDU.
!
Note
Depending on installation method (vertical or horizontal),
the LED Meter may need to be rotated, before installation,
for proper orientation.
Adjust the length of the Cord Retention Tray till the screw hole on the Tray
and PDU are aligned.