D-Link DGS-3630-28SC HW Installation Guide - Page 25
Plug the AC power cord into the power socket of the Switch.
View all D-Link DGS-3630-28SC manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
DGS-3630 Series Layer 3 Stackable Managed Switch Hardware Installation Guide Figure 3-5 Insert Tie Wrap into the Switch 2. Plug the AC power cord into the power socket of the Switch. Figure 3-6 Connect the power cord to the Switch 3. Slide the retainer through the tie wrap until the end of the cord. 25
DGS-3630 Series Layer 3 Stackable Managed Switch Hardware Installation Guide
25
Figure 3-5 Insert Tie Wrap into the Switch
2.
Plug the AC power cord into the power socket of the Switch.
Figure 3-6 Connect the power cord to the Switch
3.
Slide the retainer through the tie wrap until the end of the cord.