D-Link DSN-6120 User Manual - Page 109
Status, Create multi-path on the replication job, Create multi-path
View all D-Link DSN-6120 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 109 highlights
Figure 5.11.13 3. User can monitor the replication job from the "Status" information and the progress is expressed by percentage. Figure 5.11.14 Create multi-path on the replication job 1. Click the "Create multi-path" in the operation menu of the replication job. Figure 5.11.15 2. Enter the IP of iSCSI port on controller 2 of the target IP SAN storage. 109
109
Figure 5.11.13
3.
User can monitor the replication job from the
“Status”
information and the progress is
expressed by percentage.
Figure 5.11.14
Create multi-path on the replication job
1.
Click the
“Create multi-path”
in the operation menu of the replication job.
Figure 5.11.15
2.
Enter the IP of iSCSI port on controller 2 of the target IP SAN storage.