Dacor REMP3 Installation Instructions - Page 8
Installation Instructions - parts
View all Dacor REMP3 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 8 highlights
Installation Instructions warning • If the electrical service provided does not meet the power requirements for the hood/raised vent and the blower combined, do not continue with the installation. Contact a licensed electrician to correct the situation before continuing. • Failure to connect the wiring as specified may result in an electric shock hazard and/or improper blower operation. • To avoid the risk of fire or electric shock, turn off power at the circuit breaker panel or fuse box before connecting the blower to the power source. • The blower assembly is heavy. Do not attempt to lift or move it without assistance. Parts List 2. Remove the blower's top cover by removing the screws around the edge that hold it in place. Figure 6 Verify Package Contents • 2 1/2" wood mounting screws (8) • Blower assembly Parts Required • 3 conductor wiring/conduit with UL certified strain relief on each end (length is determined by remote blower location). • If the blower will be mounted to a surface other than wood, fasteners designed for the material the unit will be mounted to must be provided. The fasteners must be capable of supporting the weight of the blower (see weight table on page 5) and meet local codes and ordinances. • Consult the hood or raised vent installation instructions for additional part requirements. Installation 1. Before installing the blower, unpack the unit and check for physical damage to the motor and blower assembly. To do so, reach in through the intake collar and spin the fan blades slowly. They should spin freely and quietly without vibration. Intake Collar Fan Blades 3. Apply sealant between the blower and the mounting surface where the flange around the edge of the blower will rest. Flange Air Discharge Blower Sealant Sealant 45° Adjustable Elbow Roof Figure 7 Round Duct 4. Pick up the blower assembly and center it on the mounting surface inserting the intake collar into the cutout. 5. While holding the blower in place, fasten it to the mounting surface with eight (8) mounting screws. The mounting holes are located inside the blower assembly chassis near the sides. 6. Install the duct work according to the installation instructions for the hood or raised vent. Support the duct weight as necessary to ensure properly sealed joints. Figure 5 Bottom of Blower 6