Dell Latitude 7490 7390 7490 Technical Guidebook - Page 58

Method 516.5 SHOCK Procedure II: Material to be Packaged, Model, Dell Latitude 7000 Series

Page 58 highlights

Model Dell Latitude 7000 Series • METHOD 502.5 LOW TEMPERATURE Procedure I (Exaggerated) • METHOD 502.5 LOW TEMPERATURE Procedure II • METHOD 507.5 Procedure II Humidity Aggravated Cycle • METHOD 510.5 SAND AND DUST Procedure I • IP5x Dust Ingress Duration: 8 hours • METHOD 514.6 VIBRATION Procedure I • Method 516.6 SHOCK Procedure I: Functional Shock • Method 516.6 SHOCK Procedure IV: Transit Drop; Modified to be dropped at 30 • Method 516.5 SHOCK Procedure II: Material to be Packaged • Method 516.5 SHOCK Procedure V: Crash Hazard Shock • Method 516.6 SHOCK Procedure VI: Bench Handling 58 Engineering specifications

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59

Model
Dell Latitude 7000 Series
METHOD 502.5 LOW TEMPERATURE Procedure I
(Exaggerated)
METHOD 502.5 LOW TEMPERATURE Procedure II
METHOD 507.5 Procedure II Humidity Aggravated Cycle
METHOD 510.5 SAND AND DUST Procedure I
IP5x Dust Ingress Duration: 8 hours
METHOD 514.6 VIBRATION Procedure I
Method 516.6 SHOCK Procedure I: Functional Shock
Method 516.6 SHOCK Procedure IV: Transit Drop;
Modified
to
be dropped at 30
Method 516.5 SHOCK Procedure II: Material to be Packaged
Method 516.5 SHOCK Procedure V: Crash Hazard Shock
Method 516.6 SHOCK Procedure VI: Bench Handling
58
Engineering
specifications