Dell PowerEdge 1800 Installation and Troubleshooting Guide (.htm) - Page 15
holes align with their respective holes on the back vertical rail.
View all Dell PowerEdge 1800 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
3 At the back of the cabinet, pull back on the mounting-bracket flange until the mounting holes align with their respective holes on the back vertical rail. 4 Install two 10-32 x 0.5-inch flange-head Phillips screws in the back mounting flange's first and third holes to secure the slide assembly to the back vertical rail. 5 Repeat steps 1 through 4 for the slide assembly on the other side of the rack. NOTE: Ensure that the rails are mounted at the same vertical position on both sides of the rack. Figure 1-6. Installing the VersaRails Rail Assemblies slide-assembly mounting-bracket flange front of rack slide assemblies (2) Rack Installation Guide 1-13
Rack Installation Guide
1-13
3
At the back of the cabinet, pull back on the mounting-bracket flange until the mounting
holes align with their respective holes on the back vertical rail.
4
Install two 10-32 x 0.5-inch flange-head Phillips screws in the back mounting flange’s first
and third holes to secure the slide assembly to the back vertical rail.
5
Repeat steps 1 through 4 for the slide assembly on the other side of the rack.
NOTE:
Ensure that the rails are mounted at the same vertical position on both sides of the rack.
Figure 1-6.
Installing the VersaRails Rail Assemblies
slide-assembly
mounting-bracket flange
front of rack
slide assemblies (2)