Dell PowerEdge R300 Rack Installation Guide - Page 25
Installing the Cable-Management Arm, At the back of the system
View all Dell PowerEdge R300 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
Installing the Cable-Management Arm NOTE: You can attach the cable-management arm to either the right or left mounting rail, depending on how you intend to route cables from the system. 1 If necessary, press the catch at the center of the cable-management arm retention latch on the tray, and rotate the latch downwards (see Figure 1-12). 2 At the back of the system, fit the latch on the front end of the cable-management arm onto the innermost bracket on the slide assembly, until the latch engages (see Figure 1-13). 3 Fit the latch on the unattached end of the cable-management arm onto the outermost bracket on the slide assembly, until the latch engages (see Figure 1-13). Figure 1-13. Installing the Cable-Management Arm 1 23 back of system 4 1 mounting rails (2) 4 cable-management arm 2 brackets (2) 3 latches (2) Four-Post Rack Installation 23