Dell PowerVault MD3620f User Manual - Page 15

Installing the Bezel, Installing HBAs and Drivers, Physically install the HBAs. - deployment guide

Page 15 highlights

3 MD3600f series storage array NOTE: Before turning on the host server(s), ensure that the storage array status LED is blue. 4 Host server(s) Installing the Bezel Install the bezel (optional). Installing HBAs and Drivers NOTE: Ensure that you read the Configuring Fibre Channel With the Dell MD3600f Series Storage Array document before continuing with this procedure. For detailed instructions about installing the MD storage software, setting up the enclosure, and the post-installation tasks, see the Deployment Guide. 1 Physically install the HBAs. 2 Connect the cables. 3 Install the HBA drivers and the operating system HBA patches/hotfixes. 4 Ensure that the recommended HBA settings are applied. Getting Started With Your System 13

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80
  • 81
  • 82
  • 83
  • 84
  • 85
  • 86
  • 87
  • 88
  • 89
  • 90
  • 91
  • 92
  • 93
  • 94

Getting Started With Your System
13
3
MD3600f series
storage array
NOTE:
Before turning on the host server(s), ensure that the storage array
status LED is blue.
4
Host server(s)
Installing the Bezel
Install the bezel (optional).
Installing HBAs and Drivers
NOTE:
Ensure that you read the
Configuring Fibre Channel With the Dell MD3600f
Series Storage Array
document before continuing with this procedure. For detailed
instructions about installing the MD storage software, setting up the enclosure, and
the post-installation tasks, see the
Deployment Guide
.
1
Physically install the HBAs.
2
Connect the cables.
3
Install the HBA drivers and the operating system HBA patches/hotfixes.
4
Ensure that the recommended HBA settings are applied.