Frigidaire FCED3000ES Installation Instructions - Page 7

Replacement Parts, Installation

Page 7 highlights

ELECTRICAL CONNECTIONS FOR 4-WIRE SYSTEM (Con't) ELECTRIC Dryer 1. Remove the screws securing the terminal block access cover and the strain relief mounting bracket located on the back of the dryer upper corner. 2. Install a U.L. listed strain relief in the entry hole of the mounting bracket. Finger tighten the nut only at this time. 3. Remove the ground wire from the green ground screw located above the terminal block. 4. Thread a U.L. listed 30 amp power cord, NEMA 14-30 type ST or SRDT through the strain relief. TYPICAL 4 CONDUCTOR RECEPTACLE BLACK 240V WHITE NEUTRAL TYPICAL 4 CONDUCTOR CORD 30 AMP NEMA 14-30 TYPE SRDT OR ST RED 240V GREEN GROUND 5. Attach the green power cord ground wire to the cabinet with the green ground screw. 6. Attach the white (neutral) power cord conductor from the power cord and the neutral ground wire from the dryer harness (removed from the ground screw in step 3) to the silver-colored center terminal on the terminal block. Tighten the screw securely. 7. Attach the red and black power cord conductors to the outer brass colored terminals on the terminal block. Do not make a sharp bend or crimp wiring/conductor at the connections. 8. Tighten the screws securing the cord restraint firmly against the power cord. 9. Tighten the strain relief nut securely so the strain relief does not turn. 10. Reinstall the terminal block access cover. INSTALLATION 2. Connect the exhaust duct to outside exhaust system. Use duct tape to seal all joints. 3. With the dryer in its final position, adjust one or more of the legs until the dryer is resting solid on all four legs. Place a level on top of the dryer. THE DRYER MUST BE LEVEL AND RESTING SOLID ON ALL FOUR LEGS. 4. Plug the power cord into a grounded outlet. NOTE: Check to ensure the power is off at circuit breaker/fuse box before plugging the power cord into the outlet. 5. Turn on the power at the circuit breaker/fuse box. Before operating the dryer, make sure the dryer area is clear and free from combustible materials, gasoline, and other flammable vapors. Also see that nothing (such as boxes, clothing, etc.) obstructs the flow of combustion and ventilation air. 6. Run the dryer through a cycle check for proper operation. NOTE: On gas dryers, before the burner will light, it is necessary for the gas line to be bled of air. If the burner does not light within 45 seconds the first time the dryer is turned on, the safety switch will shut the burner off. If this happens, turn the timer to "OFF" and wait 5 minutes before making another attempt to light. 7. Place these instructions in a location near the dryer for future reference. NOTE: A wiring diagram is located inside the dryer. REPLACEMENT PARTS If replacements parts are needed for your dryer, contact the source where you purchased your dryer, call 1-800-944-9044, or visit our website, www.frigidaire.com, for the Frigidaire Company Authorized Parts Distributor nearest you. Label all wires prior to disconnection when servicing controls. Wiring errors can cause improper and dangerous operation. Verify proper operation after servicing. Destroy the carton and plastic bags after the dryer is unpacked. Children might use them for play. Cartons covered with rugs, bedspreads, or plastic sheets can become airtight chambers causing suffocation. Place all materials in a garbage container or make materials inaccessible to children. 1. GAS CONNECTION (Gas dryers only) a. Remove the shipping cap from gas pipe at the rear of the dryer. NOTE: DO NOT connect the dryer to L.P. gas service without converting the gas valve. An L.P. conversion kit must be installed by a qualified gas technician. The instructions in this manual and all other literature included with this dryer are not meant to cover every possible condition and situation that may occur. Good safe practice and caution MUST be applied when installing, operating and maintaining any appliance. Lint Blade Retaining Pin Location and Orientation b. Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or approved pipe from gas supply line to the 3/8 inch (0.96 cm) pipe located on the back of the dryer. Use a 1/2 inch to 3/8 inch (1.27 cm to 0.96 cm) reducer for a connection. Apply an approved thread sealer that is resistant to the corrosive action of liquefied gases on all pipe connections. c. Open the shutoff valve in the gas supply line. d. Test all connections by brushing on a soapy water solution. NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME. Install the pins after the lint blade is installed. 7

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15

7
2.
Connect the exhaust duct to outside exhaust system. Use duct
tape to seal all joints.
3.
With the dryer in its final position, adjust one or more of the legs
until the dryer is resting solid on all four legs. Place a level on top
of the dryer.
THE DRYER MUST BE LEVEL AND RESTING SOLID
ON ALL FOUR LEGS.
4.
Plug the power cord into a grounded outlet. NOTE: Check to
ensure the power is off at circuit breaker/fuse box before plugging
the power cord into the outlet.
5.
Turn on the power at the circuit breaker/fuse box.
Before operating the dryer, make sure the dryer area is
clear and free from combustible materials, gasoline, and other
flammable vapors. Also see that nothing (such as boxes, clothing,
etc.) obstructs the flow of combustion and ventilation air.
6.
Run the dryer through a cycle check for proper operation.
NOTE:
On gas dryers, before the burner will light, it is necessary
for the gas line to be bled of air. If the burner does not light
within 45 seconds the first time the dryer is turned on, the safety
switch will shut the burner off. If this happens, turn the timer to
"OFF" and wait 5 minutes before making another attempt to
light.
7.
Place these instructions in a location near the dryer for future
reference.
NOTE:
A wiring diagram is located inside the dryer.
REPLACEMENT PARTS
If replacements parts are needed for your dryer, contact the source
where you purchased your dryer, call 1-800-944-9044, or visit our
website, www.frigidaire.com, for the Frigidaire Company
Authorized Parts Distributor nearest you.
Label all wires prior to disconnection when servicing
controls. Wiring errors can cause improper and dangerous operation.
Verify proper operation after servicing.
Destroy the carton and plastic bags after the dryer is
unpacked. Children might use them for play. Cartons covered with
rugs, bedspreads, or plastic sheets can become airtight chambers
causing suffocation. Place all materials in a garbage container or
make materials inaccessible to children.
The instructions in this manual and all other literature
included with this dryer are not meant to cover every possible
condition and situation that may occur. Good safe practice and
caution
MUST
be applied when installing, operating and maintaining
any appliance.
Lint Blade Retaining Pin Location and Orientation
Install the pins after the lint blade is installed.
ELECTRICAL CONNECTIONS
FOR 4-WIRE SYSTEM (Con't)
ELECTRIC Dryer
1.
Remove the screws securing the terminal block access cover and
the strain relief mounting bracket located on the back of the dryer
upper corner.
2.
Install a U.L. listed strain relief in the entry hole of the mounting
bracket. Finger tighten the nut only at this time.
3.
Remove the ground wire from the green ground screw located
above the terminal block.
4.
Thread a U.L. listed 30 amp power cord, NEMA 14-30 type ST or
SRDT through the strain relief.
5.
Attach the green power cord ground wire to the cabinet with
the green ground screw.
6.
Attach the white (neutral) power cord conductor from the power
cord and the neutral ground wire from the dryer harness
(removed from the ground screw in step 3) to the silver-colored
center terminal on the terminal block. Tighten the screw securely.
7.
Attach the red and black power cord conductors to the outer
brass colored terminals on the terminal block.
Do not make a sharp bend or crimp wiring/conductor
at
the connections.
8.
Tighten the screws securing the cord restraint firmly against the
power cord.
9.
Tighten the strain relief nut securely so the strain relief does not
turn.
10. Reinstall the terminal block access cover.
INSTALLATION
1.
GAS CONNECTION
(Gas dryers only)
a.
Remove the shipping cap from gas pipe at the rear of the
dryer.
NOTE:
DO NOT
connect the dryer to L.P. gas service without
converting the gas valve. An L.P. conversion kit must be
installed by a qualified gas technician.
b.
Connect a 1/2 inch (1.27 cm) I.D. semi-rigid or approved pipe
from gas supply line to the 3/8 inch (0.96 cm) pipe located on
the back of the dryer. Use a 1/2 inch to 3/8 inch (1.27 cm to
0.96 cm) reducer for a connection. Apply an approved thread
sealer that is resistant to the corrosive action of liquefied
gases on all pipe connections.
c.
Open the shutoff valve in the gas supply line.
d.
Test all connections by brushing on a soapy water solution.
NEVER TEST FOR GAS LEAKS WITH AN OPEN FLAME.
TYPICAL 4
CONDUCTOR CORD
RED 240V
BLACK 240V
WHITE NEUTRAL
GREEN GROUND
30 AMP NEMA 14-30 TYPE SRDT OR ST
30 AMP NEMA 14-30 TYPE SRDT OR ST
30 AMP NEMA 14-30 TYPE SRDT OR ST
30 AMP NEMA 14-30 TYPE SRDT OR ST
30 AMP NEMA 14-30 TYPE SRDT OR ST
TYPICAL 4
CONDUCTOR
RECEPTACLE