Frigidaire FGAC5045W1 Complete Owners Guide - Page 8

Labelling, Recovery, Charging procedures, Decommissioning

Page 8 highlights

8 IMPORTANT SAFETY INSTRUCTIONS 12.Charging procedures In addition to conventional charging procedures, the following requirements shall be followed. Ensure that contamination of different refrigerants does not occur when using charging equipment. Hoses or lines shall be as short as possible to minimise the amount of refrigerant contained in them. Cylinders shall be kept in an appropriate position according to the instructions. Ensure that the refrigeration system is earthed prior to charging the system with refrigerant. Label the system when charging is complete (if not already). Extreme care shall be taken not to overfill the refrigeration system. Prior to recharging the system it shall be pressure tested with OFN. The system shall be leak tested on completion of charging but prior to commissioning. A follow up leak test shall be carried out prior to leaving the site. 13. Decommissioning Before carrying out this procedure, it is essential that the technician is completely familiar with the equipment and all its detail. It is recommended good practice that all refrigerants are recovered safely. Prior to the task being carried out, an oil and refrigerant sample shall be taken in case analysis is required prior to re-use of reclaimed refrigerant. It is essential that electrical power is available before the task is commenced. a) Become familiar with the equipment and its operation. b)Isolate system electrically. c) Before attempting the procedure ensure that: Mechanical handling equipment is available, if required, for handling refrigerant cylinders; All personal protective equipment is available and being used correctly; The recovery process is supervised at all times by a competent person; Recovery equipment and cylinders conform to the appropriate standards. d)Pump down refrigerant system, if possible. e) If a vacuum is not possible, make a manifold so that refrigerant can be removed from various parts of the system. f) Make sure that cylinder is situated on the scales before recovery takes place. g)Start the recovery machine and operate in accordance with instructions. h) Do not overfill cylinders. (No more than 80% volume liquid charge). i) Do not exceed the maximum working pressure of the cylinder, even temporarily. j) When the cylinders have been filled correctly and the process completed, make sure that the cylinders and the equipment are removed from site promptly and all isolation valves on the equipment are closed off. k) Recovered refrigerant shall not be charged into another refrigeration system unless it has been cleaned and checked. 14. Labelling Equipment shall be labelled stating that it has been de-commissioned and emptied of refrigerant. The label shall be dated and signed. Ensure that there are labels on the equipment stating the equipment contains flammable refrigerant. 15. Recovery When removing refrigerant from a system, either for servicing or decommissioning, it is recommended good practice that all refrigerants are removed safely. When transferring refrigerant into cylinders, ensure that only appropriate refrigerant recovery cylinders are employed. Ensure that the correct number of cylinders for holding the total system charge is available. All cylinders to be used are designated for the recovered refrigerant and labelled for that refrigerant (i.e. special cylinders for the recovery of refrigerant). Cylinders shall be complete with pressure relief valve and associated shut-off valves in good working order. Empty recovery cylinders are evacuated and, if possible, cooled before recovery occurs.

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23

8
IMPORTANT SAFETY INSTRUCTIONS
e) If a vacuum is not possible, make a
manifold so that refrigerant can be
removed from various parts of the
system.
f) Make sure that cylinder is situated on the
scales before recovery takes place.
g)Start the recovery machine and operate
in accordance with instructions.
h) Do not overfill cylinders. (No more than
80% volume liquid charge).
i) Do not exceed the maximum working
pressure
of
the
cylinder,
even
temporarily.
j) When the cylinders have been filled
correctly and the process completed,
make sure that the cylinders and the
equipment
are
removed
from
site
promptly and all isolation valves on the
equipment are closed off.
k) Recovered
refrigerant
shall
not
be
charged into another refrigeration system
unless it has been cleaned and checked.
14.
Labelling
Equipment shall be labelled stating that it
has been de-commissioned and emptied
of refrigerant. The label shall be dated
and signed. Ensure that there are labels
on the equipment stating the equipment
contains flammable refrigerant.
15.Recovery
When
removing
refrigerant
from
a
system,
either
for
servicing
or
decommissioning, it is recommended
good practice that all refrigerants are
removed
safely.
When
transferring
refrigerant into cylinders, ensure that only
appropriate
refrigerant
recovery
cylinders are employed. Ensure that the
correct number of cylinders for holding
the total system charge is available. All
cylinders to be used are designated for
the recovered refrigerant and labelled for
that refrigerant (i.e. special cylinders for
the recovery of refrigerant). Cylinders
shall be complete with pressure relief
valve and associated shut-off valves in
good working order. Empty recovery
cylinders are evacuated and, if possible,
cooled before recovery occurs.
12.Charging procedures
In addition to conventional charging
procedures, the following requirements
shall
be
followed.
Ensure
that
contamination of different refrigerants
does not occur when using charging
equipment. Hoses or lines shall be as
short as possible to minimise the amount
of
refrigerant
contained
in
them.
Cylinders shall be kept in an appropriate
position according to the instructions.
Ensure that the refrigeration system is
earthed prior to charging the system with
refrigerant.
Label
the
system
when
charging is complete (if not already).
Extreme care shall be taken not to overfill
the
refrigeration
system.
Prior
to
recharging the system it shall be pressure
tested with OFN. The system shall be leak
tested on completion of charging but
prior to commissioning. A follow up leak
test shall be carried out prior to leaving
the site.
13. Decommissioning
Before carrying out this procedure, it is
essential that the technician is completely
familiar with the equipment and all its
detail. It is recommended good practice
that all refrigerants are recovered safely.
Prior to the task being carried out, an oil
and refrigerant sample shall be taken in
case analysis is required prior to re-use of
reclaimed refrigerant. It is essential that
electrical power is available before the
task is commenced.
a) Become familiar with the equipment and
its operation.
b)Isolate system electrically.
c) Before attempting the procedure ensure
that: Mechanical handling equipment is
available,
if
required,
for
handling
refrigerant
cylinders;
All
personal
protective equipment is available and
being
used
correctly;
The
recovery
process is supervised at all times by a
competent person; Recovery equipment
and cylinders conform to the appropriate
standards.
d)Pump
down
refrigerant
system,
if
possible.