GE GP50T06TVT Use and Care Manual - Page 20
Installation Checklist
View all GE GP50T06TVT manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 20 highlights
Safety Instructions Installation Instructions Operating Instructions Installation Checklist A. Water Heater Location ❑ Close to area of vent. ❑ Indoors and protected from freezing temperatures. ❑ Proper clearance from combustible surfaces observed and water heater not installed on carpeted floor. ❑ Sufficient fresh air supply for proper operation of water heater. ❑ Air supply free of corrosive elements and flammable vapors. B. Water Supply ❑ Water heater completely filled with water. ❑ Air purged from water heater and piping. ❑ Water connections tight and free of leaks. ❑ Provisions made to protect area from water damage. ❑ Sufficient room to service heater. ❑ Combustible materials, such as clothing, cleaning materials, rags, etc. clear of the base of the heater. ❑ Clearances of 1" from combustion air inlet openings observed ❑ Flammable vapor sensor is not blocked. Care and Cleaning Troubleshooting Tips C. Gas Supply ❑ Gas line equipped with shut-off valve, union and sediment trap. ❑ Approved pipe joint compound used. ❑ Soap and water solution used to check all D. Relief Valve ❑ Temperature and Pressure Relief Valve properly installed and discharge line run to open drain. ❑ Discharge line protected from freezing. connections and fittings for possible gas leak. ❑ Gas Company inspected installation (if required). E. Venting ❑ F lue baffle properly hung in top of heater's flue. ❑ Blower assembly properly installed. ❑ Vent connector(s) pitched upward to chimney (¼" per foot of length minimum) . ❑ Vent connector(s) securely fastened together with screws. ❑ Single wall vent connector(s) at least 6" from combustible material. ❑ Vapors from PVC cement and primer have dissipated prior to applying electrical power. 20 Customer Service