GE JGP933SEKSS Installation Instructions - Page 4
iNstallatION iNstRUctIONs, PrePAring THe oPening - cutout
View all GE JGP933SEKSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
Installation Instructions PREPARING THE OPENING 1 Maintain the following MINIMUM clearance dimensions 13″ MAX. Depth of unprotected overhead cabinets 36c3u″/4tMMoIuNIN.t .toclesaidreanwcaellforonmthe right of the unit 30″ MIN. clearance from countertop to unprotected overhead surface 18″ MIN. height from countertop to nearest cabinet on either side of unit 3-3/4″ MIN. clearance from cutout to side wall on the left of the unit NOTE: All gas cooktop models require 7/16″ free area below cooktop height to combustible material. 2 Overall cooktop dimensions 30″ Cooktop 21″ (21-1/2″ Max. for Glass Top models) 3″ 19-3/8″ 28-1/4″ 4 Recommended Gas Supply Location from backwall 1" Min. From Backwall Recommended gas supply location 13-1/4″ From Cutout Center Line 5 Make sure wall coverings, countertop and cabinets around cooktop can withstand heat (up to 200°F) generated by cooktop Wall covering, cabinets and countertop must withstand heat up to 200°F 3 Cutout dimensions of countertop To ensure accuracy, it is best to make a template when cutting the opening in the counter. 2-1/4" Min. Between cutout and the wall behind the cooktop 28-1/2" length of cut 19-5/8" width cut 14-1/4″ 2-1/2" Min. from front edge of cutout and front edge of countertop 4