GE PDT750SSFSS Installation Instructions - Page 6

Dishwasher Installation, IMPORTANT - dishwasher manual

Page 6 highlights

Dishwasher Installation STEP 1: PREPARATION Locate the items in the installation package: • Screws • Junction box cover • Drain hose and clamp • Mounting brackets • Trim pieces (on some models) • Drain hose hanger • Owner's Manual • Product samples and/or coupons STEP 2: CHECK DOOR BALANCE NOTE: If installing a Custom Door Panel (available on some models), please follow the instructions Door closes within 20° found in the Custom Door Panel kit. • With dishwasher on Door stays in position from 20° to 70° the wood base, check the door balance by Door falls fully open beyond 70° opening and closing the door. Side View • Door is properly balanced if, when Figure G opened, it self closes within 20° from vertical, stays in position from 20° to 70° and falls fully open beyond 70°. • If necessary increase or decrease tension as shown. Latch door and adjust both springs to the same tension setting to correct balance. Side View STEP 3: REMOVE WOOD BASE, INSTALL LEVELING LEGS IMPORTANT - 'RQRWNLFNRȺZRRGEDVH Damage will occur. • Move the dishwasher close to the installation location and lay it on its back. • Remove the 4 leveling legs on the underside of the wood base with a 15/16" socket wrench. • Discard base. Approx. 1/2" Figure I • Screw leveling legs back into the dishwasher frame, approximately 1/2" from frame as shown. NOTE: Some models have rear adjustable leveling wheels, and will not require the 2 rear leveling legs. STEP 4: REMOVE TOEKICK • Remove the 2 toekick screws and toekick. Set aside for use in Step 24. Figure J Toekick Remove 2 Toekick Screws Increase Tension Front View Decrease Tension Spring hooked to screw inside leg Make sure pulley cable is within pulley shoulders Figure H Tip: Make sure door opens and closes smoothly. Check door opening and closing. If door does not open easily or falls too quickly, check spring cable routing. The cable is held in place by "shoulders" on the pulley. Check to be sure cable has not slipped over the pulley shoulders and is routed as shown. 6 STEP 5: POSITION SOUND BARRIER (on some models) Skip this step if the sound barrier is not assembled to the dishwasher. Lift the sound barrier and tape to the door front with masking tape. This will hold the sound barrier up and out of the way during installation. Tape Sound Barrier Figure K Bottom Front View

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48

Sound Barrier
Bottom Front View
Tape
NOTE:
If installing a Cus-
tom Door Panel (available
on some models), please
follow the instructions
found in the Custom
Door Panel kit.
• With dishwasher on
the wood base, check
the door balance by
opening and closing
the door.
• Door is properly
balanced if, when
opened, it self closes within 20° from vertical, stays in position
from 20° to 70° and falls fully open beyond 70°.
• If necessary increase or decrease tension as shown. Latch
door and adjust both springs to the same tension setting to
correct balance.
Dishwasher Installation
• Screw leveling legs back into the dishwasher frame,
approximately 1/2" from frame as shown.
NOTE:
Some models have rear adjustable leveling wheels, and
will not require the 2 rear leveling legs.
Approx.
1/2"
STEP 3:
REMOVE WOOD BASE,
INSTALL LEVELING LEGS
IMPORTANT
Damage will occur.
• Move the dishwasher close to the installation location and lay
it on its back.
• Remove the 4 leveling legs on the underside of the wood base
with a 15/16" socket wrench.
• Discard base.
STEP 1:
PREPARATION
Locate the items in the installation package:
• Screws
• Junction box cover
• Drain hose and clamp
• Mounting brackets
• Trim pieces (on some models)
• Drain hose hanger
• Owner's Manual
• Product samples and/or coupons
Figure I
Toekick
Remove 2
Toekick Screws
STEP 4: REMOVE TOEKICK
• Remove the 2 toekick screws and toekick. Set aside for use in
Step 24.
Figure J
6
Tip: Make sure door opens and closes smoothly.
Check door opening and closing. If door does not open easily or
falls too quickly, check spring cable routing. The cable is held in
place by “shoulders” on the pulley. Check to be sure cable has
not slipped over the pulley shoulders and is routed as shown.
STEP 2: CHECK DOOR BALANCE
STEP 5:
POSITION SOUND BARRIER
(on some models)
Skip this step if the sound
barrier is not assembled
to the dishwasher.
Lift the sound barrier and
tape to the door front with
masking tape. This will
hold the sound barrier up
and out of the way during
installation.
Increase
Tension
Decrease
Tension
Front
View
Figure H
Side View
Make sure
pulley cable is
within pulley
shoulders
Spring
hooked
to screw
inside leg
Figure G
Door
closes
within
20°
Door stays in
position from
20° to 70°
Door falls fully
open beyond 70°
Side View
Figure K