GE PG40T09AVH Use and Care Manual - Page 14
Installation checklist.
View all GE PG40T09AVH manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 14 highlights
Operating Instructions Installation Instructions Safety Instructions Installation checklist. Water Heater Location ■ Close to area of vent. ■ Indoors and protected from freezing temperatures. ■ Proper clearance from combustible surfaces observed and water heater not installed on carpeted floor. ■ Sufficient fresh air supply for proper operation of water heater. ■ Air supply free of corrosive elements and flammable vapors. Water Supply ■ Water heater completely filled with water. ■ Air purged from water heater and piping. ■ Water connections tight and free of leaks. Gas Supply ■ Gas line equipped with shut-off valve, union and sediment trap. ■ Approved pipe joint compound used. Relief Valve ■ Temperature and Pressure Relief Valve properly installed and discharge line run to open drain. ■ Discharge line protected from freezing. Venting ■ Flue baffle properly hung in top of heater's flue. ■ Draft hood properly installed. ■ Vent connector(s) pitched upward to chimney (1/4" per foot of length minimum). ■ Provisions made to protect area from water damage. ■ Sufficient room to service heater. ■ Combustible materials, such as clothing, cleaning materials, rags, etc. clear of the base of the heater. ■ Clearances from combustion air inlet openings observed (see page 7). ■ Soap and water solution used to check all connections and fittings for possible gas leak. ■ Gas Company inspected installation (if required). ■ Vent connector(s) securely fastened together with screws. ■ Single wall vent connector(s) at least 6" from combustible material. Care and Cleaning Troubleshooting Tips Customer Service 14