GE PGP953SETSS Installation Instructions - Page 4
Installation Instructions, PREPARING THE OPENING - model #
View all GE PGP953SETSS manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 4 highlights
Installation Instructions PREPARING THE OPENING 1 MAINTAIN THE FOLLOWING MINIMUM CLEARANCE DIMENSIONS 13″ MAX. Depth of unprotected overhead cabinets 3 3/4 MIN. 30″ MIN. clearance from countertop to unprotected overhead surface 18″ MIN. height from countertop to nearest cabinet on either side of unit 3 CUTOUT DIMENSIONS OF COUNTERTOP To ensure accuracy, it is best to make a template when cutting the opening in the counter. 19-5/8" width cut 28-1/2" length of cut 14-1/4″ NOTE: All gas cooktop models require 7/16″ free area below cooktop bottom to combustible material. C - MIN. from cooktop to rear vertical combustibles A - MIN. from cooktop to right vertical combustibles B - MIN. from cooktop to left vertical combustibles 30" or wider cabinet base A PGP953 5" PGP959 11" CPG350 11" B C 3" 1-5/16" 11" 2" 11" 2" ALL HORIZONTAL CLEARANCES MUST BE MAINTAINED FOR A MINIMUM OF 18" ABOVE THE COOKING SURFACE. 2 OVERALL COOKTOP DIMENSIONS 30″ 21″ Cooktop 19-3/8″ 28-1/4″ 3-1/4″ 4 RECOMMENDED GAS SUPPLY LOCATION FROM BACKWALL 1" Min. From Backwall Recommended gas supply location 7″ From Cutout Center Line 5 MAKE SURE WALL COVERINGS, COUNTERTOP AND CABINETS AROUND COOKTOP CAN WITHSTAND HEAT (UP TO 200°F) GENERATED BY COOKTOP Wall covering, cabinets and countertop must withstand heat up to 200°F 4