GE PSB120 Installation Instructions - Page 2
Safety Information, BEFORE YOU BEGIN - model
View all GE PSB120 manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 2 highlights
Safety Information BEFORE YOU BEGIN Read these instructions completely and carefully. IMPORTANT - Save these instructions for local inspector's use. IMPORTANT - Observe all governing codes and ordinances. • Note to Installer - Be sure to leave these instructions with the Consumer. • Note to Consumer - Keep these instructions with your Owner's Manual for future reference. • Skill Level - Installation of this appliance requires basic mechanical and electrical skills. • Completion Time - 1 Hour. • Proper installation is the responsibility of the installer. Product failure due to improper installation is not covered under the warranty. See Owner's Manual for warranty information. NOTE: This oven is only approved to be installed under the specific models as labeled on this unit. IMPORTANT - Use this oven only for its intended purpose. Never use the oven for warming or heating a room. Prolonged use of the oven without proper ventilation can be hazardous. CAUTION: For personal safety, remove house fuse or oven circuit breaker before beginning installation to avoid severe or fatal shock injury. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of the 80-pound oven and 30-pound drawer, plus additional oven loads of up to 50 pounds or a total weight of up to 160 pounds. CAUTION: If installing the Advantium 120V Oven below 36″, you must use the plastic bottom trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces. CAUTION: If installing the Advantium 120V Oven below 36″, do not remove the plastic door trim due to burn risk to children. The plastic trim acts as insulation and will help prevent burns to children from hot surfaces. CONTENTS Design Information Models Available 2 Product Dimensions and Clearances 3 Tools and Parts Required 3 Parts Supplied 3 Electrical Tools and Parts Required 3 Advance Planning 3 Installation Preparation Electrical Requirements 4 Install Junction Box 4 Preparing the Opening (Installation without an accessory storage drawer 5-8 Preparing the Opening (Installation with an accessory storage drawer 9-12 Installation Under a 36″ Cooktop 12 Installation Instructions Step 1, Remove Packaging and Parts 13 Step 2, Install Door Trim 14 Step 3, Route Conduit 14 Step 4, Install Bottom Trim 15 Step 5, Install Mounting Screws 15 Step 6, Finalize Installation 15 MODELS AVAILABLE Profile Models: PSB1200WW-White* PSB1200BB-Black PSB1201SS-Stainless Steel Monogram Models: ZSC1201SS-Stainless Steel ZSC1202SS-Stainless Steel** *No color-matched drawer available for this model. **This unit cannot be installed with an accessory storage drawer. 2