GE PSB1201NSS Installation Instructions - Page 6

Installation Preparation, Preparation, an Accessory Storage Drawer - weight

Page 6 highlights

Installation Preparation Preparation WITHOUT an Accessory Storage Drawer PREPARE THE OPENING (cont.) Installation over a GE/Monogram oven: 30″ 23-1/2″ 25-1/4″ 17-1/2″ Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 2″ Min. (3″ Recommended) Per Oven Requirement PREPARE THE OPENING (cont.) Installation over a GE/Monogram Oven and Warming Drawer: 30″ 23-1/2″ 25-1/4″ 17-1/2″ Construct Solid Bottom Min. 3/8″ Plywood Supported by 2 x 4 or 2 x 2 Runners all Four Sides 2″ Min. (3″ Recommended) Per Oven Requirement • If you are replacing a GE/Monogram electric double oven with the combined installation of an Advantium 120V and a single oven, use the dimensions shown. The middle rail separating the two openings may need to be larger than the 2″ minimum shown. Per Warming Drawer Requirement 2″ Min. (3″ Recommended) NOTE: Additional clearances between the cutouts may be required. Check to be sure the oven supports above the Warming Drawer location do not obstruct the required interior depth and height. See Warming Drawer installation instructions for details. CAUTION: For personal safety, the mounting surface must be capable of supporting the cabinet load, in addition to the added weight of this approximate 80-pound oven, plus additional oven loads of up to 50 pounds or a total weight of 130 pounds. 6

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20

Installation Preparation
6
Preparation
WITHOUT
an Accessory Storage Drawer
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram Oven and
Warming Drawer:
NOTE:
Additional clearances between the cutouts
may be required. Check to be sure the oven
supports above the Warming Drawer location
do not obstruct the required interior depth
and height. See Warming Drawer installation
instructions for details.
CAUTION:
For personal safety, the
mounting surface must be capable of supporting
the cabinet load, in addition to the added weight
of this approximate 80-pound oven, plus
additional oven loads of up to 50 pounds
or a total weight of 130 pounds.
Construct Solid
Bottom Min.
3/8
Plywood
Supported by
2 x 4 or 2 x 2
Runners all
Four Sides
30
23-1/2
25-1/4
17-1/2
2
Min.
(3
Recommended)
Per Oven
Requirement
2
Min.
(3
Recommended)
PREPARE THE OPENING (cont.)
Installation over a GE/Monogram oven:
• If you are replacing a GE/Monogram electric
double oven with the combined installation
of an Advantium 120V and a single oven, use
the dimensions shown. The middle rail separating
the two openings may need to be larger than
the 2
minimum shown.
30
23-1/2
25-1/4
17-1/2
2
Min.
(3
Recommended)
Construct Solid
Bottom Min.
3/8
Plywood
Supported by
2 x 4 or 2 x 2
Runners all
Four Sides
Per Oven
Requirement
Per Warming
Drawer Requirement