GE PSB2200NBB Installation Instructions - Page 11
Install Bottom Trim, Install Mounting Screws, Finalize Installation - lighting
UPC - 084691171157
View all GE PSB2200NBB manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 11 highlights
Installation Instructions 3 INSTALL BOTTOM TRIM NOTE: If installing the Advantium 240 Oven with an accessory storage drawer, the bottom trim is not required. Proceed to Step 4. • Align bottom trim tabs to slots in the bottom of the oven. 4 INSTALL MOUNTING SCREWS • Secure the bottom trim to the bottom of the oven using 3 brass screws provided. • Slide the oven the remaining way into the opening so that the side flanges and control panel are against the cabinet frame. Make sure that the oven is centered in the opening. • Open the door, place a turntable tray in the oven and make sure that the tray in the unit is level. • Drill pilot holes through the side flanges. • Drive the color matched screws into the side flanges. It is recommended that the screws be hand tightened. If installing oven with an accessory storage drawer: • Open the drawer. • Drill pilot holes through the side flanges. • Drive color match screws into the side flanges. It is recommended that the screws be hand tightened. 5 FINALIZE INSTALLATION • Turn power on at the source. The interior light should come on when the door is opened. • Refer to Owner's Manual for operating instructions. 11