Indoor unit installation, Trial operation

Page 8 highlights

Indoor unit installation * Caution To enable normal discharge of water, use drainpipes according to the installation manual. To avoid forming of dewdrops, it must be treated for heat isolation. Inappropriate tubing may lead to water leakage in the room. Requirements: The indoor drainpipe should be treated for heat isolation. The indoor connections must have heat isolation. Inappropriate isolation may lead to dew forming. The drainpipe must have a falling gradient (above 1/100) and should not be made into an ì Sî form, otherwise, it will produce noises. The horizontal length of the pipe should be shorter than 20m. If the pipe is long, one support should be set up for every 1.5-2m. Avoid undulation of the pipe. Centralized piping is installed according to the following diagram. Never apply external forces on the connections of the drainpipe. 1. 5m~2m support isolation material falling gradient above 1/100 "S" shaped pipe as large as possible(about 10 cm) falling VP30 gradient (above 1/100) Pipe material and isolation material Unit attached parts: Pipe material Isolation material Hard PVC pipe 31.5mm (inner diameter) Foam polyethylene thickness above 10mm Trial operation Before operation Before the unit is turned on, test the resistance between the power block terminal (L, N terminals) and the earth.If it is below 1M , it can't allowed running. Turn on the outdoor unit. To protect the compressor during start-up, it should be switched on 12 hours in advance. Never operate the electromagnetic contactor manually for forced trial run. (It is dangerous when the protection device does not work.) Trial operation Refer to the service manual for the running procedure. When the unit fails to start under room temperature, try forced trial run by the following steps. Cooling mode Set the running mode to ì Coolî Press the ON/OFF button till an ì Lî blinks at the ì Setting Tempî area on the wire controller LCD and ì Autoî is displayed at the fan speed area. Now the unit enters into cooling trial run. Heating mode Set the running mode to ì Heatî Press the ON/OFF button till a blinking ì Hî and an ì Autoî sign appear on the wire controller. Now the unit enters into heating trial run. During forced trial run, working modes cannot be changed through the wire controller. After trial run, press the ON/OFF button to stop the unit. 6 15

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12

The indoor drainpipe should be treated for heat isolation.
The indoor connections must have heat isolation. Inappropriate isolation may lead to
dew forming.
The drainpipe must have a falling gradient (above 1/100) and should not be made into
an ìSî form, otherwise, it will produce noises.
The horizontal length of the pipe should be shorter than 20m. If the pipe is long, one
support should be set up for every 1.5-2m. Avoid undulation of the pipe.
Centralized piping is installed according to the following diagram.
Never apply external forces on the connections of the drainpipe.
To enable normal discharge of water, use drainpipes according to the installation manual. To
avoid forming of dewdrops, it must be treated for heat isolation. Inappropriate tubing may
lead to water leakage in the room.
Caution
Requirements:
Pipe material
*
1.
5m~2m
isolation
material
"S" shaped pipe
VP30
as large as possible(about 10 cm)
falling gradient
above 1/100
support
falling
gradient
(above 1/100)
Pipe material and isolation material
Unit attached parts:
Isolation material
Hard PVC pipe 31.5mm (inner diameter)
Foam polyethylene thickness above 10mm
6
Indoor unit installation
Trial operation
15
Before operation
Heating mode
Set the running mode to ì Heatî
Press the ON/OFF button till a blinking ìHî and an ìAutoî sign appear on the wire controller. Now
the unit enters into heating trial run.
During forced trial run, working modes cannot be changed through the wire controller.
After trial run, press the ON/OFF button to stop the unit.
Trial operation
Refer to the service manual for the running procedure.
When the unit fails to start under room temperature, try forced trial run by the following steps.
Cooling mode
Set the running mode to ì Coolî
Press the ON/OFF button till an ìLî blinks at the ìSetting Tempî area on the wire
controller LCD and ìAutoî is displayed at the fan speed area. Now the unit enters
into cooling trial run.
Before the unit is turned on, test the resistance between the power block terminal (L, N terminals) and
the earth.If it is below 1M
, it can't allowed running.
Turn on the outdoor unit. To protect the compressor during start-up, it should be switched on 12 hours
in advance.
Never operate the electromagnetic contactor manually for forced trial run. (It is dangerous when the