Haier AB092ACBHA User Manual - Page 25
Check and Test Run
View all Haier AB092ACBHA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 25 highlights
Check and Test Run Other Instructions 1.Configuration of power supply Air conditioner must use special power supply system (above 20A), and qualified electrician makes wiring and fixing according to wiring regulations specified in national standard. In socket, exactly distinguish earth wire with neutral wire and it is wrong to connect them together. A leakage breaker must be installed. Parameters of power supply: H07RN-F 3G 2.0mm2 Connection method is Y-connection .If the power cord is damaged, it must be replaced by professional people of manufacturer or its maintenance department or similar to avoid dangers. 2.Pipe cutting and expanding Must remove burrs if cut pipes with pipe cutter. Expand flare after insert the pipe expander. Liquid pipe Gas pipe Diameter of pipe 6.35mm (1/4î) 12.7mm (1/2î) Dimension A (mm) 0.8~1.5 1.0~2.0 A Pipe expander Correct Incorrect Deflection Crack occurs Broken Incomplete Over outward Installation check and test run Require customers to use air conditioner according to the operation manual. The items checked during test run,please mark in No gas leakage on the pipe joint ? How about the thermal insulation of the pipe joint: Is the electrical wiring between indoor and outdoor unit connected to the terminal block firmly? Is the wiring of indoor and outdoor unit secured firmly? Is the drainage hose arranged correct? Is the earthing wire connected firmly? Is the power supply voltage conformed to the electrical regulation? Any noise? Is the display on the control board (LCD) correct? Cooling normal? Does the indoor temperature regulator work normally? For the power supply 1 shall be connected to the live wire. 2 shall be connected to the neutral wire. Shall be connected to the earth wire. 23