Haier AS122FCBHA User Manual - Page 15
leaked
View all Haier AS122FCBHA manuals
Add to My Manuals
Save this manual to your list of manuals |
Page 15 highlights
I INSTRUCTIONS TO INSTALLATION Lid for right piping Lid for under piping pipe Heat insulation material 0 Drain hose O \\. Lid for left piping 1 iping Pipe supporting plate Indoor/Outdoor Electric cable Fix with adhesive tape • Indoor/outdoor electric cord and drain hose must be bound with refrigerant piping by protecting tape. Other direction piping • Cut away, with a nipper, the lid for piping according to the piping direction and then bend the pipe according to the position of wall hole. When bending, be careful not to crash pipes. • Connect beforehand the indoor/outdoor electric cable, and then pull out the connected to the heat insulation of connecting part specially. 5.F ixing the indoor unit body • Hang surely the unit body onto the upper notches of the mounting plate. Move the body from side to verify its secure fixing. • In order to fix the body onto the mounting plate, hold up the body aslant from the underside and then put it down perpendicularly. 4 / puti\ INSTALLATION CHECK AND TRIAL OPERATION Check the Layout of the Drain Pipe and Connection Wires The drain pipe should be placed underneath, and the connection wires should be placed upside; and the drain pipe especially the section inside the machine and indoors must be wound up with insulating material to preserve heat.The drain pipe shall be sloped and no concave and convex shall occur along the whole pipe. And the cases as the right figure indicates shall not occur. Installation check • Is power supply voltage required? • Is water completely drained to outdoors? • Are power wire and connection wires between indoor and outdoor units correctly connected? • Is any gas leaked from the pipe connectors? • Are series numbers of the terminals on the indoor and outdoor units corresponding to each other? Is the connection section of the auxiliary pipe insulated? Is the indoor unit fixed firmly? • Is noise big? Trial Operation The person who has completed this installation shall be requested to conduct a test operation for check: • Is the temperature adjuster working normally? • Does the location for installation conform to requirements? Winding up with Protective Plastic Tape The connection pipes, drain pipe, and the connection wires shall be wound up with PVC tape. Notes: The connection pipes shall also be wound up with insulating material to preserve the temperature. The airing direction shall be from bottom to top. 14