Haier ESA408M Use and Care Guide - Page 12

Unpacking The Air Conditioner, Preparing The Air Conditioner

Page 12 highlights

ENGLISH UNPACKING THE AIR CONDITIONER WARNING EXCESSIVE WEIGHT HAZARD When moving or lifting the air conditioner, use two or more people. Wear gloves when handling the air conditioner to protect against possible sharp edges and metal fins. REMOVE PACKAGING MATERIALS • Remove packaging materials. Save the carton and the foam packaging for storing the unit when not in use. NOTE: There are NO internal packing materials to remove-Do Not open the cabinet. • Handle the air conditioner gently. • Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back or upside down. • The air conditioner must be standing upright for 2 hours prior to installation and operation. PREPARING THE AIR CONDITIONER INSTALL TOP CHANNEL Front Fig. 8 7/16" Screw Top Channel 1. Place the top channel on the top of the air conditioner, lining up the holes in the top channel with the holes in the top of the unit. Make sure the channel is facing forward as indicated by the sticker. (See Fig.8) 2. Using 7/16" self-tapping screws, attach the top channel to the top of the air conditioner. (See Fig.9) Use four (4) 7/16" self-tapping screws for models: ESA410M ESA412M Use three (3) 7/16" self-tapping screws for models: HWR05XCM ESA405M ESA406M ESA408M Fig. 9 PAGE 10 HOW TO INSTALL

  • 1
  • 2
  • 3
  • 4
  • 5
  • 6
  • 7
  • 8
  • 9
  • 10
  • 11
  • 12
  • 13
  • 14
  • 15
  • 16
  • 17
  • 18
  • 19
  • 20
  • 21
  • 22
  • 23
  • 24
  • 25
  • 26
  • 27
  • 28
  • 29
  • 30
  • 31
  • 32
  • 33
  • 34
  • 35
  • 36
  • 37
  • 38
  • 39
  • 40
  • 41
  • 42
  • 43
  • 44
  • 45
  • 46
  • 47
  • 48
  • 49
  • 50
  • 51
  • 52
  • 53
  • 54
  • 55
  • 56
  • 57
  • 58
  • 59
  • 60
  • 61
  • 62
  • 63
  • 64
  • 65
  • 66
  • 67
  • 68
  • 69
  • 70
  • 71
  • 72
  • 73
  • 74
  • 75
  • 76
  • 77
  • 78
  • 79
  • 80

REMOVE PACKAGING MATERIALS
Remove packaging materials. Save the carton and the foam packaging for storing the unit when
not in use.
NOTE:
There are NO internal packing materials to remove—Do Not open the cabinet.
Handle the air conditioner gently.
Keep the air conditioner upright and level. Do not set the air conditioner on its side, front, back
or upside down.
The air conditioner must be standing upright for 2 hours prior to installation and operation.
INSTALL TOP CHANNEL
1. Place the top channel on the top of the air conditioner, lining up
the holes in the top channel with the holes in the top of the unit.
Make sure the channel is facing forward as indicated by the
sticker.
(See Fig.8)
2. Using
7/16" self-tapping screws, attach the top channel to the top
of the air conditioner.
(See Fig.9)
Use four (4)
7/16" self-tapping screws for models:
ESA410M
ESA412M
Use three (3)
7/16" self-tapping screws for models:
HWR05XCM
ESA405M
ESA406M
ESA408M
UNPACKING THE AIR CONDITIONER
PREPARING THE AIR CONDITIONER
ENGLISH
EXCESSIVE WEIGHT HAZARD
When moving or lifting the air conditioner, use two or more people.
Wear gloves when handling the air conditioner to protect against
possible sharp edges and metal fins.
WARNING
PAGE 10
HOW TO INSTALL
Fig. 8
Fig. 9
Top Channel
7/16" Screw
Front